[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":625},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,2,50,1656,[13,34,48,61,73,85,97,109,121,131,143,155,167,179,191,204,216,228,241,253,266,274,286,298,310,322,334,346,359,371,383,395,407,420,433,445,457,469,481,493,505,517,529,541,553,565,577,589,601,613],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":32,"analysis":33},958119,"多选题","需要编制洪水影响评价报告的建设项目包括( )。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","非防洪建设项目",false,{"key":23,"text":24,"correct":25},"B","洪泛区内非防洪建设项目",true,{"key":27,"text":28,"correct":25},"C","蓄滞洪区内非防洪建设项目",{"key":30,"text":31,"correct":21},"D","防洪保护区内非防洪建设项目","BC","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":23,"analysis":33},958120,1,"单选题","蓄滞洪区安全建设计划( )。",[40,42,44,46],{"key":19,"text":41,"correct":21},"由水利部组织制定",{"key":23,"text":43,"correct":25},"由所在地省、自治区、直辖市人民政府组织制定",{"key":27,"text":45,"correct":21},"由省级水行政主管部门组织制定",{"key":30,"text":47,"correct":21},"由国务院和省级人民政府组织制定",{"id":49,"libraryId":5,"type":9,"typeLabel":15,"stem":50,"options":51,"answer":60,"analysis":33},958121,"对蓄滞洪区，我国实施了的措施包括( )。",[52,54,56,58],{"key":19,"text":53,"correct":25},"国家和有关各级地方人民政府的扶持",{"key":23,"text":55,"correct":25},"对蓄滞洪区的人口外迁给予经济补偿",{"key":27,"text":57,"correct":25},"对灾后的恢复和重建给予救助",{"key":30,"text":59,"correct":25},"受益地区应当对蓄滞洪区的损失给予相应的补偿和救助","ABCD",{"id":62,"libraryId":5,"type":36,"typeLabel":37,"stem":63,"options":64,"answer":27,"analysis":33},958122,"建设跨河、临河的桥梁、道路、管道等工程设施，其可行性研究报告( )。",[65,67,69,71],{"key":19,"text":66,"correct":21},"要按照国家规定的基本建设程序报请批准，勿须水行政主管部门审查同意",{"key":23,"text":68,"correct":21},"由水行政主管部门审查同意",{"key":27,"text":70,"correct":25},"其中的工程建设方案应先经有关水行政主管部门审查同意，然后进入报请批准程序",{"key":30,"text":72,"correct":21},"由建设主管部门和水行政部门审查同意",{"id":74,"libraryId":5,"type":9,"typeLabel":15,"stem":75,"options":76,"answer":32,"analysis":33},958123,"电力建设、生产、供应和使用应当( )。",[77,79,81,83],{"key":19,"text":78,"correct":21},"利用可再生能源",{"key":23,"text":80,"correct":25},"采用新技术、减少有害物质排放",{"key":27,"text":82,"correct":25},"防治污染和其他公害",{"key":30,"text":84,"correct":21},"利用清洁能源发电",{"id":86,"libraryId":5,"type":9,"typeLabel":15,"stem":87,"options":88,"answer":60,"analysis":33},958124,"电力发展规划应当体现的原则是( )",[89,91,93,95],{"key":19,"text":90,"correct":25},"合理利用能源",{"key":23,"text":92,"correct":25},"电源与电网配套发展",{"key":27,"text":94,"correct":25},"提高经济效益",{"key":30,"text":96,"correct":25},"有利于环境保护",{"id":98,"libraryId":5,"type":36,"typeLabel":37,"stem":99,"options":100,"answer":27,"analysis":33},958125,"电力发展规划制定的依据是( )。",[101,103,105,107],{"key":19,"text":102,"correct":21},"根据环境保护的需要",{"key":23,"text":104,"correct":21},"根据经济发展的需要",{"key":27,"text":106,"correct":25},"根据国民经济和社会发展的需要",{"key":30,"text":108,"correct":21},"根据生产与生活的需要",{"id":110,"libraryId":5,"type":9,"typeLabel":15,"stem":111,"options":112,"answer":120,"analysis":33},958126,"电力建设项目应当( )。",[113,115,117,119],{"key":19,"text":114,"correct":25},"符合电力发展规划和国家电力产业政策",{"key":23,"text":116,"correct":25},"不得使用国家明令淘汰的电力设备和技术",{"key":27,"text":118,"correct":21},"由地方人民政府提供征用土地的优先保障",{"key":30,"text":84,"correct":21},"AB",{"id":122,"libraryId":5,"type":36,"typeLabel":37,"stem":123,"options":124,"answer":30,"analysis":33},958127,"电力事业投资的原则为( )。",[125,127,128,129],{"key":19,"text":126,"correct":21},"合理利用能源、电源与电网配套发展",{"key":23,"text":94,"correct":21},{"key":27,"text":96,"correct":21},{"key":30,"text":130,"correct":25},"谁投资、谁收益",{"id":132,"libraryId":5,"type":9,"typeLabel":15,"stem":133,"options":134,"answer":120,"analysis":33},958128,"制定电价的基本原则是应当合理补偿成本，合理确定收益，同时还应当( )。",[135,137,139,141],{"key":19,"text":136,"correct":25},"依法计入税金",{"key":23,"text":138,"correct":25},"坚持公平负担",{"key":27,"text":140,"correct":21},"有利市场竞争",{"key":30,"text":142,"correct":21},"提高生活质量",{"id":144,"libraryId":5,"type":36,"typeLabel":37,"stem":145,"options":146,"answer":27,"analysis":33},958129,"在城市规划区内新建、扩建和改建建筑物、构筑物、道路、管线等工程设施，建设单位或者个人( )。",[147,149,151,153],{"key":19,"text":148,"correct":21},"必须持建设工程规划许可证，办理有关审批手续",{"key":23,"text":150,"correct":21},"取得有关批准文件后，可申请办理开工手续",{"key":27,"text":152,"correct":25},"取得建设工程规划许可证后，即可申请办理开工手续",{"key":30,"text":154,"correct":21},"取得建设用地规划许可证后，即可申请办理开工手续",{"id":156,"libraryId":5,"type":36,"typeLabel":37,"stem":157,"options":158,"answer":23,"analysis":33},958130,"下列关于临时占用草原的说法，正确的是( )。",[159,161,163,165],{"key":19,"text":160,"correct":21},"临时占用的期限不得超过三年",{"key":23,"text":162,"correct":25},"不得在临时占用的草原上修建永久性建筑物、构筑物",{"key":27,"text":164,"correct":21},"临时占用应由省级政府主管部门同意",{"key":30,"text":166,"correct":21},"占用期满及时退还",{"id":168,"libraryId":5,"type":9,"typeLabel":15,"stem":169,"options":170,"answer":60,"analysis":33},958131,"草原保护、建设、利用规划应当与土地利用总体规划相衔接，与下列规划相协调( )。",[171,173,175,177],{"key":19,"text":172,"correct":25},"环境保护规划",{"key":23,"text":174,"correct":25},"水资源规划",{"key":27,"text":176,"correct":25},"城市总体规划",{"key":30,"text":178,"correct":25},"水土保持规划",{"id":180,"libraryId":5,"type":9,"typeLabel":15,"stem":181,"options":182,"answer":32,"analysis":33},958132,"开发利用水资源，应当首先满足和兼顾的用水需要分别是( )。",[183,185,187,189],{"key":19,"text":184,"correct":21},"城市建设与发展用水",{"key":23,"text":186,"correct":25},"城乡居民生活用水",{"key":27,"text":188,"correct":25},"农业、工业、生态环境用水以及航运等用水",{"key":30,"text":190,"correct":21},"生态环境的改善与保护用水",{"id":192,"libraryId":5,"type":9,"typeLabel":15,"stem":193,"options":194,"answer":203,"analysis":33},958133,"从事建设工程勘察、设计的单位，应当在其资质等级许可的范围内承揽工程( )。",[195,197,199,201],{"key":19,"text":196,"correct":21},"只有在有关部门批准的情况下，才能以其他勘察、设计单位的名义承揽工程",{"key":23,"text":198,"correct":25},"不得允许其他单位或者个人以本单位的名义承揽工程",{"key":27,"text":200,"correct":21},"不得转包或者分包所承揽工程",{"key":30,"text":202,"correct":25},"不得违法分包所承揽工程","BD",{"id":205,"libraryId":5,"type":36,"typeLabel":37,"stem":206,"options":207,"answer":30,"analysis":33},958134,"从事建设工程勘察、设计活动，应当坚持的原则是( )。",[208,210,212,214],{"key":19,"text":209,"correct":21},"先勘察，后设计和施工",{"key":23,"text":211,"correct":21},"先勘察和设计，后施工",{"key":27,"text":213,"correct":21},"勘察、设计、施工既有先后，又有交叉",{"key":30,"text":215,"correct":25},"先勘察，后设计，再施工",{"id":217,"libraryId":5,"type":36,"typeLabel":37,"stem":218,"options":219,"answer":27,"analysis":33},958135,"建设工程勘察、设计应当与社会、经济发展水平相适应，做到( )。",[220,222,224,226],{"key":19,"text":221,"correct":21},"经济效益和社会效益相统一",{"key":23,"text":223,"correct":21},"经济效益和环境效益相统一",{"key":27,"text":225,"correct":25},"经济效益、社会效益和环境效益相统一",{"key":30,"text":227,"correct":21},"市场效益、公共效益和生态效益相统一",{"id":229,"libraryId":5,"type":9,"typeLabel":15,"stem":230,"options":231,"answer":240,"analysis":33},958136,"《建设工程勘查设计管理条例》中禁止建设工程勘察、设计单位的行为包括( )。",[232,234,236,238],{"key":19,"text":233,"correct":25},"以设计单位的名义承揽建设工程勘察、设计业务",{"key":23,"text":235,"correct":21},"使用注册土木工程师(水利水电工程)称谓与本人的注册证书和执业印章",{"key":27,"text":237,"correct":25},"超越其资质等级许可的范围或者以其他建设工程勘察",{"key":30,"text":239,"correct":25},"允许其他单位或者个人以本单位的名义承揽建设工程勘察、设计业务","ACD",{"id":242,"libraryId":5,"type":36,"typeLabel":37,"stem":243,"options":244,"answer":19,"analysis":33},958137,"移民安置规划( )。",[245,247,249,251],{"key":19,"text":246,"correct":25},"由水利水电工程建设单位会同县级以上地方人民政府编制",{"key":23,"text":248,"correct":21},"应当先于设计任务书报主管部门审批",{"key":27,"text":250,"correct":21},"由省级人民政府负责实施",{"key":30,"text":252,"correct":21},"由工程主管部门会同当地人民政府编制",{"id":254,"libraryId":5,"type":9,"typeLabel":15,"stem":255,"options":256,"answer":265,"analysis":33},958138,"防洪建筑物级别，按《城市防洪工程设计规范》(CJJ50-92)确定。应根据城市等别及其在工程中的作用和重要性确定。下列说法正确的是( )。",[257,259,261,263],{"key":19,"text":258,"correct":25},"一等城市其主要永久性建筑物级别为1级、次要永久性建筑物级别为3级，临时性建筑物级别为4级。",{"key":23,"text":260,"correct":25},"二等城市其主要永久性建筑物级别为2级、次要永久性建筑物级别为3级，临时性建筑物级别为4级。",{"key":27,"text":262,"correct":25},"三等城市其主要永久性建筑物级别为3级、次要永久性建筑物级别为4级，临时性建筑物级别为4级。",{"key":30,"text":264,"correct":21},"四等城市其主要永久性建筑物级别为4级、次要永久性建筑物级别为4级，临时性建筑物级别为4级。","ABC",{"id":267,"libraryId":5,"type":36,"typeLabel":37,"stem":268,"options":269,"answer":19,"analysis":33},958139,"邻层水越流补给量，是地下水资源重要的补给来源。如果弱透水层的渗透系数K=40m\u002Fd，弱透水层厚度为M=2m，越流含水层的补给面积F=10000㎡，相邻含水层的水头差h=10m，那么越流补给量是( )m3\u002Fd。",[270,271,272,273],{"key":19,"text":33,"correct":25},{"key":23,"text":33,"correct":21},{"key":27,"text":33,"correct":21},{"key":30,"text":33,"correct":21},{"id":275,"libraryId":5,"type":36,"typeLabel":37,"stem":276,"options":277,"answer":27,"analysis":33},958140,"国家对水资源依法实行的以下哪项制度？( )。",[278,280,282,284],{"key":19,"text":279,"correct":21},"定额取水制度",{"key":23,"text":281,"correct":21},"计划取水制度",{"key":27,"text":283,"correct":25},"取水许可制度",{"key":30,"text":285,"correct":21},"需水许可制度",{"id":287,"libraryId":5,"type":36,"typeLabel":37,"stem":288,"options":289,"answer":27,"analysis":33},958141,"国家对水资源实行的管理体制是( )。",[290,292,294,296],{"key":19,"text":291,"correct":21},"流域管理",{"key":23,"text":293,"correct":21},"行政区域管理",{"key":27,"text":295,"correct":25},"流域管理与行政区域管理相结合",{"key":30,"text":297,"correct":21},"灌区管理",{"id":299,"libraryId":5,"type":9,"typeLabel":15,"stem":300,"options":301,"answer":120,"analysis":33},958142,"设计单位应当根据勘察成果文件进行建设工程设计( )。",[302,304,306,308],{"key":19,"text":303,"correct":25},"设计文件应当注明工程合理使用年限",{"key":23,"text":305,"correct":25},"设计文件中选用的建筑材料，应当注明规格、型号、性能等技术指标",{"key":27,"text":307,"correct":21},"设计单位对建筑材料一律不得指定生产厂、供应商",{"key":30,"text":309,"correct":21},"设计单位根据需要参与建设工程质量事故分析",{"id":311,"libraryId":5,"type":36,"typeLabel":37,"stem":312,"options":313,"answer":19,"analysis":33},958143,"国家对水工程建设移民实行开发性移民的方针，按照( )原则，妥善安排移民的生产和生活，保护移民的合法权益。",[314,316,318,320],{"key":19,"text":315,"correct":25},"前期补偿、补助与后期扶持相结合",{"key":23,"text":317,"correct":21},"可持续发展",{"key":27,"text":319,"correct":21},"水资源统一管理",{"key":30,"text":321,"correct":21},"社会收益最大化",{"id":323,"libraryId":5,"type":9,"typeLabel":15,"stem":324,"options":325,"answer":240,"analysis":33},958144,"抽水蓄能电站按水流来源可分为( )。",[326,328,330,332],{"key":19,"text":327,"correct":25},"纯抽水蓄能电站",{"key":23,"text":329,"correct":21},"抽水泵站",{"key":27,"text":331,"correct":25},"混合式抽水蓄能电站",{"key":30,"text":333,"correct":25},"调水式抽水蓄能电站",{"id":335,"libraryId":5,"type":36,"typeLabel":37,"stem":336,"options":337,"answer":23,"analysis":33},958145,"粒径大于2mm的颗粒含量不超过全重的50%、粒径大于0.075mm的颗粒超过全重50%的土称为( )。",[338,340,342,344],{"key":19,"text":339,"correct":21},"碎石土",{"key":23,"text":341,"correct":25},"砂土",{"key":27,"text":343,"correct":21},"粉土",{"key":30,"text":345,"correct":21},"黏性土",{"id":347,"libraryId":5,"type":9,"typeLabel":15,"stem":348,"options":349,"answer":358,"analysis":33},958146,"风力对土、沙、石粒的吹移搬运一般有( )三种运动形式。",[350,352,354,356],{"key":19,"text":351,"correct":25},"吹扬",{"key":23,"text":353,"correct":25},"跃移",{"key":27,"text":355,"correct":21},"漂流",{"key":30,"text":357,"correct":25},"滚动","ABD",{"id":360,"libraryId":5,"type":36,"typeLabel":37,"stem":361,"options":362,"answer":19,"analysis":33},958147,"在饮用水源保护区内设置排污口的，由县级以上地方人民政府责令限期拆除、恢复原状；逾期不拆除、不恢复原状的，强行拆除、恢复原状，并处( )。",[363,365,367,369],{"key":19,"text":364,"correct":25},"5万元以上10万元以下罚款",{"key":23,"text":366,"correct":21},"1万元以上10万元以下罚款",{"key":27,"text":368,"correct":21},"2万元以上10万元以下罚款",{"key":30,"text":370,"correct":21},"1万以上5万元以下罚款",{"id":372,"libraryId":5,"type":9,"typeLabel":15,"stem":373,"options":374,"answer":358,"analysis":33},958148,"按照《中华人民共和国水法》规定，在河道管理范围内建设妨碍引洪的建筑物、构筑物，由县级以上人民政府水行政主管部门或者流域管理机构依据职权，进行以下处理( )。",[375,377,379,381],{"key":19,"text":376,"correct":25},"责令停止违法行为，限期拆除，恢复原状",{"key":23,"text":378,"correct":25},"逾期不拆除，强行拆除",{"key":27,"text":380,"correct":21},"可以处1万元以上5万元以下的罚款",{"key":30,"text":382,"correct":25},"并处1万元以上10万元以下的罚款",{"id":384,"libraryId":5,"type":36,"typeLabel":37,"stem":385,"options":386,"answer":23,"analysis":33},958149,"《中华人民共和国防洪法》由第八届人大常委会第二十七次会议通过，并以国家主席第八十八号令公布，开始施行的时间为( )。",[387,389,391,393],{"key":19,"text":388,"correct":21},"1988年1月21日",{"key":23,"text":390,"correct":25},"1998年1月1日",{"key":27,"text":392,"correct":21},"2001年11月16日",{"key":30,"text":394,"correct":21},"2002年8月29日",{"id":396,"libraryId":5,"type":36,"typeLabel":37,"stem":397,"options":398,"answer":30,"analysis":33},958150,"从事工程建设项目招标代理业务的招标代理机构，其资格应由( )认定。",[399,401,403,405],{"key":19,"text":400,"correct":21},"国务院建设行政主管部门",{"key":23,"text":402,"correct":21},"省、自治区、直辖市人民政府的建设行政主管部门",{"key":27,"text":404,"correct":21},"由国务院规定的部门",{"key":30,"text":406,"correct":25},"A或B",{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":409,"options":410,"answer":419,"analysis":33},958151,"可以划定为规划保留区的土地范围包括( )。",[411,413,415,417],{"key":19,"text":412,"correct":21},"河道两侧的土地",{"key":23,"text":414,"correct":21},"河道及堤防用地",{"key":27,"text":416,"correct":25},"河道整治计划用地",{"key":30,"text":418,"correct":25},"规划建设的堤防用地","CD",{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":432,"analysis":33},958152,"岩石的抗剪强度指标，按岩石受力作用形式不同可以分为( )。",[424,426,428,430],{"key":19,"text":425,"correct":21},"直剪试验强度",{"key":23,"text":427,"correct":25},"抗剪断强度",{"key":27,"text":429,"correct":25},"抗剪(摩擦)强度",{"key":30,"text":431,"correct":25},"抗切强度","BCD",{"id":434,"libraryId":5,"type":36,"typeLabel":37,"stem":435,"options":436,"answer":30,"analysis":33},958153,"《电力法》中所称电价是指( )。",[437,439,441,443],{"key":19,"text":438,"correct":21},"电力生产企业的上网电价",{"key":23,"text":440,"correct":21},"电网间的互供电价，电网销售电价",{"key":27,"text":442,"correct":21},"电力生产企业的上网电价，电网销售电价",{"key":30,"text":444,"correct":25},"电力生产企业的上网电价，电网间互供电价，电网销售电价",{"id":446,"libraryId":5,"type":9,"typeLabel":15,"stem":447,"options":448,"answer":120,"analysis":33},958154,"防洪规划与相关规划的关系是( )。",[449,451,453,455],{"key":19,"text":450,"correct":25},"防洪规划应当服从所在流域、分级实施",{"key":23,"text":452,"correct":25},"区域防洪规划应当服从所在流域、区域的防洪规划",{"key":27,"text":454,"correct":21},"防洪规划是区域综合规划制定的前提",{"key":30,"text":456,"correct":21},"流域综合规划应以防洪规划为依据",{"id":458,"libraryId":5,"type":36,"typeLabel":37,"stem":459,"options":460,"answer":19,"analysis":33},958155,"水力侵蚀、重力侵蚀的强度分级，当土壤允许流失量[t／(k㎡·a)]为( )时是轻度侵蚀。",[461,463,465,467],{"key":19,"text":462,"correct":25},"200，500，1000～2500t\u002F(k㎡·a)",{"key":23,"text":464,"correct":21},"2500～5000t\u002F(k㎡·a)",{"key":27,"text":466,"correct":21},"＜200，500，1000t\u002F(k㎡·a)",{"key":30,"text":468,"correct":21},"5000～8000t\u002F(k㎡·a)",{"id":470,"libraryId":5,"type":36,"typeLabel":37,"stem":471,"options":472,"answer":19,"analysis":33},958156,"应按照不同的水质标准和防护要求，分级划分水源保护区的水域是( )。",[473,475,477,479],{"key":19,"text":474,"correct":25},"集中式供水的饮用水水源地",{"key":23,"text":476,"correct":21},"源头水保护区",{"key":27,"text":478,"correct":21},"国家级和省级自然保护区范围内的水域",{"key":30,"text":480,"correct":21},"对典型生态、自然生境保护具有重要意义的水域",{"id":482,"libraryId":5,"type":9,"typeLabel":15,"stem":483,"options":484,"answer":203,"analysis":33},958157,"对投标人的要求有( )。",[485,487,489,491],{"key":19,"text":486,"correct":21},"个人不能参加投标",{"key":23,"text":488,"correct":25},"两价目以上法人代表或者其他组织，可以共同投标",{"key":27,"text":490,"correct":21},"由同一专业的单位组成的联合体，按照资质等级较高的单位确定资质等级",{"key":30,"text":492,"correct":25},"个人可以参加科研项目的投标",{"id":494,"libraryId":5,"type":9,"typeLabel":15,"stem":495,"options":496,"answer":120,"analysis":33},958158,"在河道管理范围内建设桥梁、码头、临河建筑物等工程设施，需要扩建、改建、拆除原有水工程设施的( )。",[497,499,501,503],{"key":19,"text":498,"correct":25},"建设单位应当负担扩建、改建的费用",{"key":23,"text":500,"correct":25},"建设单位应当负担损失补偿",{"key":27,"text":502,"correct":21},"有关政府部门应当负担扩建、改建的费用",{"key":30,"text":504,"correct":21},"有关政府部门应当负担损失补偿",{"id":506,"libraryId":5,"type":9,"typeLabel":15,"stem":507,"options":508,"answer":265,"analysis":33},958159,"《中华人民共和国电力法》规定，电价实行的原则为( )。",[509,511,513,515],{"key":19,"text":510,"correct":25},"统一政策",{"key":23,"text":512,"correct":25},"统一定价",{"key":27,"text":514,"correct":25},"分级管理",{"key":30,"text":516,"correct":21},"公平与效率",{"id":518,"libraryId":5,"type":9,"typeLabel":15,"stem":519,"options":520,"answer":265,"analysis":33},958160,"渗流计算的方法有( )。",[521,523,525,527],{"key":19,"text":522,"correct":25},"流网法",{"key":23,"text":524,"correct":25},"改进阻力系数法",{"key":27,"text":526,"correct":25},"直线法",{"key":30,"text":528,"correct":21},"瑞典圆弧法",{"id":530,"libraryId":5,"type":9,"typeLabel":15,"stem":531,"options":532,"answer":240,"analysis":33},958161,"建筑设计单位不按照建筑工程质量、安全标准进行设计的( )。",[533,535,537,539],{"key":19,"text":534,"correct":25},"责令改正，处以罚款",{"key":23,"text":536,"correct":21},"造成工程质量事故的，没收违法所得，并处罚款",{"key":27,"text":538,"correct":25},"造成损失的，承担赔偿责任",{"key":30,"text":540,"correct":25},"构成犯罪的，依法追究刑事责任",{"id":542,"libraryId":5,"type":9,"typeLabel":15,"stem":543,"options":544,"answer":120,"analysis":33},958162,"岩体结构包含( )两个要素。",[545,547,549,551],{"key":19,"text":546,"correct":25},"结构面",{"key":23,"text":548,"correct":25},"结构体",{"key":27,"text":550,"correct":21},"断层",{"key":30,"text":552,"correct":21},"产状",{"id":554,"libraryId":5,"type":9,"typeLabel":15,"stem":555,"options":556,"answer":358,"analysis":33},958163,"根据《开发建设项目水土保持方案审批管理办法》，建设项目立项审批的程序为( )。",[557,559,561,563],{"key":19,"text":558,"correct":25},"由水行政主管部门审批水土保持方案",{"key":23,"text":560,"correct":25},"由环境保护主管部门审批环境影响报告",{"key":27,"text":562,"correct":21},"由国土部门审批征地报告",{"key":30,"text":564,"correct":25},"由计划主管部门审批项目的立项",{"id":566,"libraryId":5,"type":9,"typeLabel":15,"stem":567,"options":568,"answer":240,"analysis":33},958164,"下列问题中，( )是水库蓄水后产生的水库工程地质问题。",[569,571,573,575],{"key":19,"text":570,"correct":25},"水库渗漏",{"key":23,"text":572,"correct":21},"水库淹没",{"key":27,"text":574,"correct":25},"水库淤积",{"key":30,"text":576,"correct":25},"水库诱发地震",{"id":578,"libraryId":5,"type":9,"typeLabel":15,"stem":579,"options":580,"answer":120,"analysis":33},958165,"根据《中华人民共和国水法》规定，地方各级人民政府应当结合本地区水资源的实际情况，合理组织开发、综合利用水资源，其原则有( )。",[581,583,585,587],{"key":19,"text":582,"correct":25},"地表水与地下水统一调度开发",{"key":23,"text":584,"correct":25},"开源与节流相结合、节流优先和污水处理再利用",{"key":27,"text":586,"correct":21},"谁投资建设、谁管理和谁受益",{"key":30,"text":588,"correct":21},"多目标梯级开发",{"id":590,"libraryId":5,"type":9,"typeLabel":15,"stem":591,"options":592,"answer":265,"analysis":33},958166,"根据地下厂房在引水系统中的位置，地下厂房的开发方式有( )。",[593,595,597,599],{"key":19,"text":594,"correct":25},"首部式",{"key":23,"text":596,"correct":25},"中部式",{"key":27,"text":598,"correct":25},"尾部式",{"key":30,"text":600,"correct":21},"窑洞式",{"id":602,"libraryId":5,"type":9,"typeLabel":15,"stem":603,"options":604,"answer":120,"analysis":33},958167,"根据《中华人民共和国土地管理法》的规定，经批准的土地利用总体规划的修改，须经原批准机关批准，未经批准，不得改变原规划确定的土地用途。在下述情况下，按照规定可修改土地利用总体规划( )。",[605,607,609,611],{"key":19,"text":606,"correct":25},"经国务院批准的大型能源、交通、水利等基础设施建设用地",{"key":23,"text":608,"correct":25},"经省级人民政府批准的能源、交通、水利等基础设施建设用地",{"key":27,"text":610,"correct":21},"经市级人民政府批准的能源、交通、水利等基础设施建设用地",{"key":30,"text":612,"correct":21},"经县级人民政府批准的能源、交通、水利等基础设施建设用地",{"id":614,"libraryId":5,"type":9,"typeLabel":15,"stem":615,"options":616,"answer":60,"analysis":33},958168,"坝基(肩)下的渗透水流，使岩体中的某些颗粒移动或颗粒成分、结构发生改变的现象称为渗透变形或渗透破坏。坝基的渗透变形的类型主要有( )几种类型。",[617,619,621,623],{"key":19,"text":618,"correct":25},"管涌",{"key":23,"text":620,"correct":25},"流土",{"key":27,"text":622,"correct":25},"接触冲刷",{"key":30,"text":624,"correct":25},"接触流失",[626,629,632,635,638,641],{"id":36,"name":627,"category":7,"favorite":628},"领导干部任职前廉政法规知识测试题",92,{"id":630,"name":631,"category":7,"favorite":36},595,"建筑结构与设备",{"id":633,"name":634,"category":7,"favorite":36},715,"招标采购专业知识与法律法规",{"id":636,"name":637,"category":7,"favorite":36},848,"市政方向-通用基础",{"id":639,"name":640,"category":7,"favorite":8},534,"BIM工程师",{"id":642,"name":640,"category":7,"favorite":8},535]