[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":497},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,16,50,1656,[13,34,42,54,62,70,82,94,105,117,124,132,143,151,160,168,180,190,202,209,217,229,237,249,261,268,276,286,294,302,311,319,327,335,347,356,364,372,379,387,398,406,414,422,430,438,446,458,472,485],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},958819,1,"单选题","初拟机型、单机容量、机组台数及布置；初步提出电站的送电方向、出线电压、回路数和输电距离；初拟电气主接线、主要设备及布置，绘制主接线简图，是( )阶段的主要内容之一。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目建议书",false,{"key":24,"text":25,"correct":26},"B","预可行性研究",true,{"key":28,"text":29,"correct":22},"C","可行性研究",{"key":31,"text":32,"correct":22},"D","初步设计","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},958820,"查明影响工程的主要地质条件和主要工程地质问题，是( )阶段的主要内容之一。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":28,"analysis":33},958821,"2级混凝土坝的洪水标准为( )。",[46,48,50,52],{"key":20,"text":47,"correct":22},"设计取重现期50～30年，校核取重现期500～200年",{"key":24,"text":49,"correct":22},"设计取重现期100～50年，校核取重现期1000～500年",{"key":28,"text":51,"correct":26},"设计取重现期500～100年，校核取重现期2000～1000年",{"key":31,"text":53,"correct":22},"设计取重现期1000～500年，校核取重现期5000～2000年",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":31,"analysis":33},958822,"拟定水利工程的管理机构，提出工程管理范围和保护范围以及主要管理设施，是( )阶段的主要内容之一。",[58,59,60,61],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":63,"libraryId":5,"type":15,"typeLabel":16,"stem":64,"options":65,"answer":24,"analysis":33},958823,"提出淹没控制高程，作为拟定正常蓄水位的重要条件；收集及必要时重点调查淹没实物指标，初步分析安置环境容量及移民安置的去向和条件；估算淹没补偿投资，是( )阶段的主要内容之一。",[66,67,68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},958824,"山区、丘陵区水利水电工程的永久性泄水建筑物消能防冲设计的洪水标准，根据泄水建筑物的级别确定，4级泄水建筑物的取重现期为( )年重现期。",[74,76,78,80],{"key":20,"text":75,"correct":26},"20",{"key":24,"text":77,"correct":22},"30",{"key":28,"text":79,"correct":22},"50",{"key":31,"text":81,"correct":22},"100",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},958825,"Ⅴ等工程的永久性水工建筑物级别，主要建筑物与次要建筑物级别下列说法正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"主要建筑物为5级，次要建筑物为2级",{"key":24,"text":89,"correct":22},"主要建筑物为5级，次要建筑物为3级",{"key":28,"text":91,"correct":22},"主要建筑物为5级，次要建筑物为4级",{"key":31,"text":93,"correct":26},"主要建筑物为5级，次要建筑物为5级",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":96,"answer":24,"analysis":33},958826,[97,99,101,103],{"key":20,"text":98,"correct":22},"大(1)型Ⅰ等工程",{"key":24,"text":100,"correct":26},"大(2)型Ⅱ等工程",{"key":28,"text":102,"correct":22},"中型Ⅲ等工程",{"key":31,"text":104,"correct":22},"小(1)型Ⅳ等工程",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},958827,"1级水电站厂房的洪水标准为( )。",[109,111,113,115],{"key":20,"text":110,"correct":22},"设计取重现期50～30年，校核取重现期100年",{"key":24,"text":112,"correct":22},"设计取重现期100～50年，校核取重现期200年",{"key":28,"text":114,"correct":22},"设计取重现期200～100年，校核取重现期500年",{"key":31,"text":116,"correct":26},"设计取重现期200年，校核取重现期1000年",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":119,"answer":28,"analysis":33},958828,[120,121,122,123],{"key":20,"text":98,"correct":22},{"key":24,"text":100,"correct":22},{"key":28,"text":102,"correct":26},{"key":31,"text":104,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},958829,"初拟机组、电气主接线及其他主要核发电设备和布置，是( )阶段的主要内容之一。",[128,129,130,131],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":134,"answer":24,"analysis":33},958830,[135,137,139,141],{"key":20,"text":136,"correct":22},"1",{"key":24,"text":138,"correct":26},"2",{"key":28,"text":140,"correct":22},"3",{"key":31,"text":142,"correct":22},"4",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":24,"analysis":33},958831,"初拟水工金属结构及启闭设备的规模及布置，是( )阶段的主要内容之一。",[147,148,149,150],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},958832,"某工程保护中等城镇向重要的供水对象供水，其工程规模及工程等别为( )。",[155,157,158,159],{"key":20,"text":156,"correct":22},"大(2)型Ⅰ等工程",{"key":24,"text":100,"correct":26},{"key":28,"text":102,"correct":22},{"key":31,"text":98,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},958833,"堤防工程级别根据堤防工程的防洪标准确定，当堤防的防洪标准大于等于100年时，堤防工程级别为( )级。",[164,165,166,167],{"key":20,"text":136,"correct":26},{"key":24,"text":138,"correct":22},{"key":28,"text":140,"correct":22},{"key":31,"text":142,"correct":22},{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":31,"analysis":33},958834,"根据灌溉效益进行工程等别划分，当灌溉面积小于0.5万亩时，工程属于( )等工程。",[172,174,176,178],{"key":20,"text":173,"correct":22},"Ⅱ",{"key":24,"text":175,"correct":22},"Ⅲ",{"key":28,"text":177,"correct":22},"Ⅳ",{"key":31,"text":179,"correct":26},"Ⅴ",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":28,"analysis":33},958835,"招标设计应根据主管部门批准的( )进行编制。",[184,185,187,188],{"key":20,"text":21,"correct":22},{"key":24,"text":186,"correct":22},"可行性研究报告",{"key":28,"text":32,"correct":26},{"key":31,"text":189,"correct":22},"施工详图设计",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},958836,"2级供水工程永久性水工建筑物的洪水标准为( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"设计取重现期20～10年，校核取重现期50～30年",{"key":24,"text":197,"correct":22},"设计取重现期30～20年，校核取重现期100～50年",{"key":28,"text":199,"correct":26},"设计取重现期50～30年，校核取重现期200～100年",{"key":31,"text":201,"correct":22},"设计取重现期100～50年，校核取重现期300～200年",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":204,"answer":31,"analysis":33},958837,[205,206,207,208],{"key":20,"text":98,"correct":22},{"key":24,"text":100,"correct":22},{"key":28,"text":102,"correct":22},{"key":31,"text":104,"correct":26},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},958838,"论证水电工程建设的必要性，提出工程开发任务是( )阶段的内容之一。",[213,214,215,216],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":20,"analysis":33},958839,"4级泵站建筑物的洪水标准为( )。",[221,223,225,227],{"key":20,"text":222,"correct":26},"设计取重现期20年，校核取重现期50年",{"key":24,"text":224,"correct":22},"设计取重现期30年，校核取重现期100年",{"key":28,"text":226,"correct":22},"设计取重现期50年，校核取重现期200年",{"key":31,"text":228,"correct":22},"设计取重现期100年，校核取重现期300年",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":28,"analysis":33},958840,"确定水库淹没、工程占地的范围；查明主要淹没实物指标；基本确定移民安置、专项设施迁建的可行性规划和投资，是( )阶段的主要内容之一。",[233,234,235,236],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},958841,"在防洪堤上修建的引水、提水工程及其他灌排建筑物，或在挡潮堤上修建的排水工程，其级别( )。",[241,243,245,247],{"key":20,"text":242,"correct":22},"大于防洪堤或挡潮堤的级别",{"key":24,"text":244,"correct":26},"不得低于防洪堤或挡潮堤的级别",{"key":28,"text":246,"correct":22},"等于防洪堤或挡潮堤的级别",{"key":31,"text":248,"correct":22},"小于防洪堤或挡潮堤的级别",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},958842,"2级灌溉和治涝工程永久性水工建筑物的洪水标准为( )。",[253,255,257,259],{"key":20,"text":254,"correct":22},"设计取重现期20～10年",{"key":24,"text":256,"correct":22},"设计取重现期50～30年",{"key":28,"text":258,"correct":26},"设计取重现期30～20年",{"key":31,"text":260,"correct":22},"设计取重现期100～50年",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":263,"answer":31,"analysis":33},958843,[264,265,266,267],{"key":20,"text":136,"correct":22},{"key":24,"text":138,"correct":22},{"key":28,"text":140,"correct":22},{"key":31,"text":142,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},958844,"当灌溉流量为20～5m3\u002Fs，排水流量为50～10m3\u002Fs时，灌排渠沟工程的级别为( )级。",[272,273,274,275],{"key":20,"text":136,"correct":22},{"key":24,"text":138,"correct":22},{"key":28,"text":140,"correct":22},{"key":31,"text":142,"correct":26},{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},958845,"项目建议书在批准的( )基础上进行编制。",[280,281,282,284],{"key":20,"text":186,"correct":22},{"key":24,"text":32,"correct":22},{"key":28,"text":283,"correct":22},"招标设计",{"key":31,"text":285,"correct":26},"江河流域综合利用规划或专业规划",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},958846,"堤防工程级别根据堤防工程的防洪标准确定，当堤防的防洪标准大于等于30年又小于50年时，堤防工程级别为( )级。",[290,291,292,293],{"key":20,"text":136,"correct":22},{"key":24,"text":138,"correct":22},{"key":28,"text":140,"correct":26},{"key":31,"text":142,"correct":22},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},958847,"简述水土保持设计方案，是( )阶段的主要内容之一。",[298,299,300,301],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},958848,"5级灌溉和治涝工程永久性水工建筑物的洪水标准为( )。",[306,308,309,310],{"key":20,"text":307,"correct":26},"设计取重现期10年",{"key":24,"text":254,"correct":22},{"key":28,"text":258,"correct":22},{"key":31,"text":256,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":313,"answer":24,"analysis":33},958849,[314,315,317,318],{"key":20,"text":98,"correct":22},{"key":24,"text":316,"correct":26},"小(2)型Ⅴ等工程",{"key":28,"text":102,"correct":22},{"key":31,"text":104,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},958850,"枢纽工程等别根据其引水流量的大小确定，当引水流量大于等于200m3\u002Fs时，引水枢纽工程为( )。",[323,324,325,326],{"key":20,"text":98,"correct":26},{"key":24,"text":100,"correct":22},{"key":28,"text":102,"correct":22},{"key":31,"text":104,"correct":22},{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},958851,"概述工程项目的主要效益，提出项目经济初步评价指标，初步评价工程的经济合理性和财务可行性，是( )阶段的主要内容之一。",[331,332,333,334],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},958852,"Ⅲ等工程的永久性水工建筑物级别，主要建筑物与次要建筑物级别下列说法正确的是( )。",[339,341,343,345],{"key":20,"text":340,"correct":22},"主要建筑物为3级，次要建筑物为1级",{"key":24,"text":342,"correct":22},"主要建筑物为3级，次要建筑物为2级",{"key":28,"text":344,"correct":22},"主要建筑物为3级，次要建筑物为3级",{"key":31,"text":346,"correct":26},"主要建筑物为3级，次要建筑物为4级",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},958853,"水库总库容在10亿～1.0亿m3的工程属于( )等工程。",[351,353,354,355],{"key":20,"text":352,"correct":22},"Ⅰ",{"key":24,"text":173,"correct":26},{"key":28,"text":175,"correct":22},{"key":31,"text":177,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},958854,"根据灌溉效益进行工程等别划分，当灌溉面积大于等于150万亩时，工程属于( )等工程。",[360,361,362,363],{"key":20,"text":352,"correct":26},{"key":24,"text":173,"correct":22},{"key":28,"text":175,"correct":22},{"key":31,"text":177,"correct":22},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},958855,"根据防洪保护对象的重要性进行工程等别划分，当保护一般城镇及工矿企业时，工程属于( )等工程。",[368,369,370,371],{"key":20,"text":352,"correct":22},{"key":24,"text":173,"correct":22},{"key":28,"text":175,"correct":22},{"key":31,"text":177,"correct":26},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":374,"answer":24,"analysis":33},958856,[375,376,377,378],{"key":20,"text":136,"correct":22},{"key":24,"text":138,"correct":26},{"key":28,"text":140,"correct":22},{"key":31,"text":142,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},958857,"3级泵站建筑物的洪水标准为( )。",[383,384,385,386],{"key":20,"text":222,"correct":22},{"key":24,"text":224,"correct":26},{"key":28,"text":226,"correct":22},{"key":31,"text":228,"correct":22},{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":389,"answer":24,"analysis":33},958858,[390,392,394,396],{"key":20,"text":391,"correct":22},"小(1)型",{"key":24,"text":393,"correct":26},"大(1)型",{"key":28,"text":395,"correct":22},"小(2)型",{"key":31,"text":397,"correct":22},"大(2)型",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},958859,"2级泵站建筑物的洪水标准为( )。",[402,403,404,405],{"key":20,"text":222,"correct":22},{"key":24,"text":224,"correct":22},{"key":28,"text":226,"correct":26},{"key":31,"text":228,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},958860,"已知某山丘区水利水电工程永久性泄水建筑物为2级，该工程消能防冲设计的洪水标准为( )年一遇。",[410,411,412,413],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},958861,"复核工程任务及具体要求，确定或复核工程规模，确定或复核水位、流量、扬程等特征值，明确运行要求，是( )阶段的主要内容之一。",[418,419,420,421],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},958862,"根据防洪保护对象的重要性进行工程等别划分，当保护重要城镇及工矿企业时，工程属于( )等工程。",[426,427,428,429],{"key":20,"text":352,"correct":22},{"key":24,"text":173,"correct":26},{"key":28,"text":175,"correct":22},{"key":31,"text":177,"correct":22},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},958863,"初定工程规模，是( )阶段的主要内容之一。",[434,435,436,437],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},958864,"山区、丘陵区水利水电工程的永久性泄水建筑物消能防冲设计的洪水标准，根据泄水建筑物的级别确定，2级泄水建筑物的取重现期为( )年重现期。",[442,443,444,445],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":22},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},958865,"可用来对自然系统稳定性进行综合分析的指标是( )。",[450,452,454,456],{"key":20,"text":451,"correct":26},"景观系统内各种拼块优势度值",{"key":24,"text":453,"correct":22},"生物量",{"key":28,"text":455,"correct":22},"物种量",{"key":31,"text":457,"correct":22},"均匀度",{"id":459,"libraryId":5,"type":460,"typeLabel":461,"stem":462,"options":463,"answer":471,"analysis":33},958866,2,"多选题","自然系统稳定性可用( )指标度量。",[464,466,468,470],{"key":20,"text":465,"correct":22},"生物生产力",{"key":24,"text":467,"correct":26},"恢复稳定性",{"key":28,"text":469,"correct":26},"阻抗稳定性",{"key":31,"text":455,"correct":22},"BC",{"id":473,"libraryId":5,"type":460,"typeLabel":461,"stem":474,"options":475,"answer":484,"analysis":33},958867,"一般说来，自然保护区包括( )。",[476,478,480,482],{"key":20,"text":477,"correct":26},"核心区",{"key":24,"text":479,"correct":22},"外围保护地带",{"key":28,"text":481,"correct":26},"缓冲区",{"key":31,"text":483,"correct":26},"实验区","ACD",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},958868,"在自然保护区的缓冲区，可以进行的活动是( )。",[489,491,493,495],{"key":20,"text":490,"correct":22},"科学实验",{"key":24,"text":492,"correct":26},"科学研究观测活动",{"key":28,"text":494,"correct":22},"教学实习",{"key":31,"text":496,"correct":22},"参观考察、旅游",[498,501,504,507,510,513],{"id":15,"name":499,"category":7,"favorite":500},"领导干部任职前廉政法规知识测试题",92,{"id":502,"name":503,"category":7,"favorite":15},595,"建筑结构与设备",{"id":505,"name":506,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":508,"name":509,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":511,"name":512,"category":7,"favorite":8},534,"BIM工程师",{"id":514,"name":512,"category":7,"favorite":8},535]