[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":511},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,15,50,1656,[13,34,45,57,65,73,85,100,113,125,133,146,154,166,178,190,202,210,223,231,238,246,254,262,273,280,291,302,314,325,334,342,350,358,366,378,386,394,402,414,426,434,442,450,458,466,472,484,495,504],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},958769,1,"单选题","水利水电工程永久性水工建筑物的洪水标准，应按山区、丘陵区和平原区、滨海区分别确定，因此建设在丘陵区的水利水电工程永久性水工建筑物一定按山区、丘陵区水利水电工程永久性水工建筑物洪水标准确定。此表述( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":22},"B","不正确",{"key":27,"text":28,"correct":22},"C","不确定",{"key":30,"text":31,"correct":32},"D","不确定，应当按具体挡水高度和上下游最大水头差的大小确定是否正确",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":36,"answer":27,"analysis":33},958770,[37,39,41,43],{"key":20,"text":38,"correct":22},"1",{"key":24,"text":40,"correct":22},"2",{"key":27,"text":42,"correct":32},"3",{"key":30,"text":44,"correct":22},"4",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":30,"analysis":33},958771,"复核工程的等级和设计标准，确定工程总体布置、主要建筑物的轴线、线路、结构型式和布置、控制尺寸、高程和工程数量，是( )阶段的主要内容之一。",[49,51,53,55],{"key":20,"text":50,"correct":22},"项目建议书",{"key":24,"text":52,"correct":22},"预可行性研究",{"key":27,"text":54,"correct":22},"可行性研究",{"key":30,"text":56,"correct":32},"初步设计",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":30,"analysis":33},958772,"选定对外交通方案、施工导流方式、施工总布置和总进度、主要建筑物施工方法及主要施工设备；提出天然(人工)建筑材料、劳动力、供水和供电的需要量及其来源，是( )阶段的主要内容之一。",[61,62,63,64],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":32},{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":24,"analysis":33},958773,"了解预勘察工程的主要地质条件和主要工程地质问题，是( )阶段的主要内容之一。",[69,70,71,72],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":32},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":20,"analysis":33},958774,"4级灌溉和治涝工程永久性水工建筑物的洪水标准为( )。",[77,79,81,83],{"key":20,"text":78,"correct":32},"设计取重现期20～10年",{"key":24,"text":80,"correct":22},"设计取重现期50～30年",{"key":27,"text":82,"correct":22},"设计取重现期30～20年",{"key":30,"text":84,"correct":22},"设计取重现期100～50年",{"id":86,"libraryId":5,"type":87,"typeLabel":88,"stem":89,"options":90,"answer":99,"analysis":33},958775,2,"多选题","山区、丘陵区水利水电工程永久性水工建筑物的洪水标准为( )。 A.1级土石坝的设计洪水标准为1000～500年一遇 B.对土石坝，如失事将造成下游特别灾害时，1级建筑物的校核洪水标准，应取可能最大洪水(PM F)或重现期10000年标准；2～4级建筑物的校核洪水标准，可提高一级。",[91,93,95,97],{"key":20,"text":92,"correct":32},"对混凝土坝、浆砌石坝，如洪水漫顶将造成极严重的损失时，1级建筑物的校核洪水标准，可取可能最大洪水(PM",{"key":24,"text":94,"correct":32},"或10000年标准",{"key":27,"text":96,"correct":22},"对混凝土坝、浆砌石坝，如洪水漫顶将造成极严重的损失时，1级建筑物的校核洪水标准，经过专门论证并报主管部门批准，可取可能最大洪水(PM",{"key":30,"text":98,"correct":32},"或重现期10000年标准","ABD",{"id":101,"libraryId":5,"type":87,"typeLabel":88,"stem":102,"options":103,"answer":112,"analysis":33},958776,"乡村应根据( )分为4个等级。",[104,106,108,110],{"key":20,"text":105,"correct":22},"重要性",{"key":24,"text":107,"correct":22},"非农业入口数量",{"key":27,"text":109,"correct":32},"防护区人口数量",{"key":30,"text":111,"correct":32},"防护区耕地面积","CD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":30,"analysis":33},958777,"地质条件是坝址选择中的重要条件，对于岩基来说( )。",[117,119,121,123],{"key":20,"text":118,"correct":22},"只能建拱坝",{"key":24,"text":120,"correct":22},"只能建重力坝",{"key":27,"text":122,"correct":22},"只能建拱坝和重力坝",{"key":30,"text":124,"correct":32},"可以建拱坝、重力坝、土石坝",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},958778,"初拟工程规模；初拟坝址、厂址和引水线路；初拟基本坝型及引水发电、泄洪、通航等主要建筑物的基本型式和必要的防沙、排沙措施；初拟工程总布置，提出总布置图，估算工程量，是( )阶段的主要内容之一。",[129,130,131,132],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":32},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":134,"libraryId":5,"type":87,"typeLabel":88,"stem":135,"options":136,"answer":145,"analysis":33},958779,"超过70m高的3级土石坝设计时( )。",[137,139,141,143],{"key":20,"text":138,"correct":22},"按3级设计",{"key":24,"text":140,"correct":32},"按2级设计",{"key":27,"text":142,"correct":32},"洪水标准不变",{"key":30,"text":144,"correct":22},"洪水标准提高","BC",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":27,"analysis":33},958780,"选定工程建设场址、坝(闸)址、厂(站)址等，是( )阶段的主要内容之一。",[150,151,152,153],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":32},{"key":30,"text":56,"correct":22},{"id":155,"libraryId":5,"type":87,"typeLabel":88,"stem":156,"options":157,"answer":99,"analysis":33},958781,"水库大坝按规范规定为2级、3级的永久性水工建筑物，如果坝高超过( )，其级别可提高一级，但洪水标准可不提高。",[158,160,162,164],{"key":20,"text":159,"correct":32},"2级土石坝，坝高超过90m",{"key":24,"text":161,"correct":32},"3级土石坝，坝高超过70m",{"key":27,"text":163,"correct":22},"2级混凝土坝、浆砌石坝，坝高超过100m",{"key":30,"text":165,"correct":32},"3级混凝土坝、浆砌石坝，坝高超过100m",{"id":167,"libraryId":5,"type":87,"typeLabel":88,"stem":168,"options":169,"answer":99,"analysis":33},958782,"下列选项属于枢纽布置设计的一般原则的是( )。",[170,172,174,176],{"key":20,"text":171,"correct":32},"应满足各个建筑物在布置上的要求，保证其在设计条件下能正常工作",{"key":24,"text":173,"correct":32},"枢纽中各建筑物应尽可能紧凑布置，在满足功能要求前提下，减少工程投资，方便运行管理",{"key":27,"text":175,"correct":22},"尽量使一个建筑物发挥一种用途或临时建筑物和永久建筑物相结合布置",{"key":30,"text":177,"correct":32},"纽布置要做到施工方便，工期短，造价低",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},958783,"当山区、丘陵地区的水利水电工程永久性水工建筑物的挡水高度低于( )，且上下游最大水头差小于( )时，其洪水标准宜按平原、滨海区标准确定。( )",[182,184,186,188],{"key":20,"text":183,"correct":22},"10m；5m",{"key":24,"text":185,"correct":22},"15m；5m",{"key":27,"text":187,"correct":32},"15m；10m",{"key":30,"text":189,"correct":22},"10m；15m",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},958784,"可行性研究报告阶段，应该( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"初步确定水文参数和结果",{"key":24,"text":197,"correct":22},"提出水文、泥沙参数和成果",{"key":27,"text":199,"correct":32},"确定主要水文参数和成果",{"key":30,"text":201,"correct":22},"复核水文成果",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},958785,"初拟金属结构设备型式和布置，是( )阶段的主要内容之一。",[206,207,208,209],{"key":20,"text":50,"correct":32},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":211,"libraryId":5,"type":87,"typeLabel":88,"stem":212,"options":213,"answer":222,"analysis":33},958786,"招标文件分为如下三类( )。",[214,216,218,220],{"key":20,"text":215,"correct":32},"主体工程招标文件",{"key":24,"text":217,"correct":22},"永久工程招标文件",{"key":27,"text":219,"correct":32},"永久设备招标文件",{"key":30,"text":221,"correct":32},"业主委托的其他工程的招标文件","ACD",{"id":224,"libraryId":5,"type":87,"typeLabel":88,"stem":225,"options":226,"answer":145,"analysis":33},958787,"超过100m高的3级混凝土坝设计时( )。",[227,228,229,230],{"key":20,"text":138,"correct":22},{"key":24,"text":140,"correct":32},{"key":27,"text":142,"correct":32},{"key":30,"text":144,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":233,"answer":20,"analysis":33},958788,[234,235,236,237],{"key":20,"text":38,"correct":32},{"key":24,"text":40,"correct":22},{"key":27,"text":42,"correct":22},{"key":30,"text":44,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},958789,"基本选定对外交通方案；初选施工导流方式、主体工程的主要施工方法和施工总布置；提出控制性工期和分期实施意见，是( )阶段的主要内容之一。",[242,243,244,245],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":32},{"key":30,"text":56,"correct":22},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},958790,"初选工程场址(坝址、闸址、厂址、输水线路等)，是( )阶段的主要内容之一。",[250,251,252,253],{"key":20,"text":50,"correct":32},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":30,"analysis":33},958791,"提出水土保持设计，是( )阶段的主要内容之一。",[258,259,260,261],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":32},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":264,"answer":24,"analysis":33},958792,[265,267,269,271],{"key":20,"text":266,"correct":22},"大(1)型Ⅰ等工程",{"key":24,"text":268,"correct":32},"大(2)型Ⅱ等工程",{"key":27,"text":270,"correct":22},"中型Ⅲ等工程",{"key":30,"text":272,"correct":22},"小(1)型Ⅳ等工程",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":275,"answer":20,"analysis":33},958793,[276,277,278,279],{"key":20,"text":266,"correct":32},{"key":24,"text":268,"correct":22},{"key":27,"text":270,"correct":22},{"key":30,"text":272,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":282,"answer":20,"analysis":33},958794,[283,285,287,289],{"key":20,"text":284,"correct":32},"Ⅴ",{"key":24,"text":286,"correct":22},"Ⅱ",{"key":27,"text":288,"correct":22},"Ⅲ",{"key":30,"text":290,"correct":22},"Ⅳ",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":27,"analysis":33},958795,"在初步设计被批准后，要进行( )。",[295,296,298,300],{"key":20,"text":50,"correct":22},{"key":24,"text":297,"correct":22},"可行性研究报告",{"key":27,"text":299,"correct":32},"招标设计",{"key":30,"text":301,"correct":22},"施工详图设计",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":30,"analysis":33},958796,"水库大坝按永久性水工建筑物级别规定为2级、3级的永久性水工建筑物，如坝高超过水库大坝提级指标，其级别可( )。",[306,308,310,312],{"key":20,"text":307,"correct":22},"提高一级",{"key":24,"text":309,"correct":22},"降低一级",{"key":27,"text":311,"correct":22},"不变",{"key":30,"text":313,"correct":32},"提高一级，但洪水标准可不提高",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":30,"analysis":33},958797,"3级混凝土坝或浆砌石坝，坝高超过100m时，其级别可( )。",[318,320,322,323],{"key":20,"text":319,"correct":22},"提高到2级",{"key":24,"text":321,"correct":22},"降低到4级",{"key":27,"text":311,"correct":22},{"key":30,"text":324,"correct":32},"提高到2级，但洪水标准可不提高",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},958798,"根据发电效益进行工程等别划分，当装机容量在30万～5万kW时，工程属于( )等工程。",[329,331,332,333],{"key":20,"text":330,"correct":22},"Ⅰ",{"key":24,"text":286,"correct":22},{"key":27,"text":288,"correct":32},{"key":30,"text":290,"correct":22},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},958799,"简述水文、气候特点，初步确定水文参数和成果，是( )阶段的主要内容之一。",[338,339,340,341],{"key":20,"text":50,"correct":32},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":344,"answer":24,"analysis":33},958800,[345,346,348,349],{"key":20,"text":266,"correct":22},{"key":24,"text":347,"correct":32},"小(2)型V等工程",{"key":27,"text":270,"correct":22},{"key":30,"text":272,"correct":22},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},958801,"可行性研究报告应根据批准的( )进行编制。",[354,355,356,357],{"key":20,"text":50,"correct":32},{"key":24,"text":56,"correct":22},{"key":27,"text":299,"correct":22},{"key":30,"text":301,"correct":22},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},958802,"论证工程建设的必要性和迫切性，提出项目的开发目标和任务的主次顺序是( )阶段的主要内容之一。",[362,363,364,365],{"key":20,"text":50,"correct":32},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},958803,"4级混凝土坝的洪水标准为( )。",[370,372,374,376],{"key":20,"text":371,"correct":32},"设计取重现期50～30年，校核取重现期500～200年",{"key":24,"text":373,"correct":22},"设计取重现期100～50年，校核取重现期1000～500年",{"key":27,"text":375,"correct":22},"设计取重现期500～100年，校核取重现期2000～1000年",{"key":30,"text":377,"correct":22},"设计取重现期1000～500年，校核取重现期5000～2000年",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},958804,"提出建设资金筹措设想，并尽可能提供国家、地方、部门、企业等有关方面的投资意向；当利用外资时，应提出利用的可能性，并分析外汇平衡情况，是( )阶段的主要内容之一。",[382,383,384,385],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":32},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":22},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},958805,"灌溉、排水泵站的等别，根据其装机流量和装机功率确定，当装机流量为200～50m3\u002Fs、装机功率为3万～1万kw时，灌溉、排水泵站工程为( )。",[390,391,392,393],{"key":20,"text":266,"correct":22},{"key":24,"text":268,"correct":32},{"key":27,"text":270,"correct":22},{"key":30,"text":272,"correct":22},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},958806,"复核经济评价，是( )阶段的主要内容之一。",[398,399,400,401],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":32},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},958807,"2级水电站厂房的洪水标准为( )。",[406,408,410,412],{"key":20,"text":407,"correct":22},"设计取重现期50～30年，校核取重现期100年",{"key":24,"text":409,"correct":22},"设计取重现期100～50年，校核取重现期200年",{"key":27,"text":411,"correct":32},"设计取重现期200～100年，校核取重现期500年",{"key":30,"text":413,"correct":22},"设计取重现期200年，校核取重现期1000年",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},958808,"Ⅰ等工程的永久性水工建筑物级别，主要建筑物与次要建筑物级别下列说法正确的是( )。",[418,420,422,424],{"key":20,"text":419,"correct":22},"主要建筑物为1级，次要建筑物为1级",{"key":24,"text":421,"correct":22},"主要建筑物为1级，次要建筑物为2级",{"key":27,"text":423,"correct":32},"主要建筑物为1级，次要建筑物为3级",{"key":30,"text":425,"correct":22},"主要建筑物为2级，次要建筑物为1级",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},958809,"确定电厂或泵站的装机容量；选定机组机型、单机容量、单机流量及台数；确定接入电力系统的方式、电气主接线和输电方式及主要机电设备的选型和布置；选定开关站(变电站、换流站)的型式；选定泵站电源进线路径、距离和线路型式；确定建筑物的闸门和启闭机等的型式和布置；确定采暖、通风型式和布置，是( )阶段的主要内容之一。",[430,431,432,433],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":22},{"key":30,"text":56,"correct":32},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},958810,"拦河水闸工程的等别，根据其过闸流量确定，当过闸流量大于等于5000m3\u002Fs时，拦河水闸工程为( )。",[438,439,440,441],{"key":20,"text":266,"correct":32},{"key":24,"text":268,"correct":22},{"key":27,"text":270,"correct":22},{"key":30,"text":272,"correct":22},{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},958811,"初选金属结构设备型式和布置，是( )阶段的主要内容之一。",[446,447,448,449],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":32},{"key":30,"text":56,"correct":22},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},958812,"引水枢纽工程等别根据其引水流量的大小确定，当引水流量为50～10m3\u002Fs时，引水枢纽工程为( )。",[454,455,456,457],{"key":20,"text":266,"correct":22},{"key":24,"text":268,"correct":22},{"key":27,"text":270,"correct":32},{"key":30,"text":272,"correct":22},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":27,"analysis":33},958813,"明确工程效益，分析主要经济评价指标，评价工程的经济合理性和财务可行性，是( )阶段的主要内容之一。",[462,463,464,465],{"key":20,"text":50,"correct":22},{"key":24,"text":52,"correct":22},{"key":27,"text":54,"correct":32},{"key":30,"text":56,"correct":22},{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},958814,"根据防洪保护对象的重要性进行工程等别划分，当保护农田面积在500万～100万亩时，工程属于( )等工程。",[470,471],{"key":20,"text":330,"correct":22},{"key":24,"text":286,"correct":32},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":30,"analysis":33},958815,"1级泵站建筑物的洪水标准为( )。",[476,478,480,482],{"key":20,"text":477,"correct":22},"设计取重现期20年，校核取重现期50年",{"key":24,"text":479,"correct":22},"设计取重现期30年，校核取重现期100年",{"key":27,"text":481,"correct":22},"设计取重现期50年，校核取重现期200年",{"key":30,"text":483,"correct":32},"设计取重现期100年，校核取重现期300年",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},958816,"在水利水电工程等别划分时，Ⅳ、Ⅴ等工程的工程规模属于( )工程。",[488,490,492,494],{"key":20,"text":489,"correct":22},"大型",{"key":24,"text":491,"correct":22},"中型",{"key":27,"text":493,"correct":32},"小型",{"key":30,"text":28,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":30,"analysis":33},958817,"某工程保护中等城镇向特别重要的供水对象供水，其工程规模及工程等别为( )。",[499,500,501,503],{"key":20,"text":270,"correct":22},{"key":24,"text":268,"correct":22},{"key":27,"text":502,"correct":22},"大(1)型Ⅱ等工程",{"key":30,"text":266,"correct":32},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":506,"answer":27,"analysis":33},958818,[507,508,509,510],{"key":20,"text":266,"correct":22},{"key":24,"text":268,"correct":22},{"key":27,"text":270,"correct":32},{"key":30,"text":272,"correct":22},[512,515,518,521,524,527],{"id":15,"name":513,"category":7,"favorite":514},"领导干部任职前廉政法规知识测试题",92,{"id":516,"name":517,"category":7,"favorite":15},595,"建筑结构与设备",{"id":519,"name":520,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":522,"name":523,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":525,"name":526,"category":7,"favorite":8},534,"BIM工程师",{"id":528,"name":526,"category":7,"favorite":8},535]