[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":479},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,14,50,1656,[13,34,43,54,62,74,86,97,105,116,124,132,141,156,169,176,183,195,207,216,223,230,238,250,258,266,274,282,289,298,306,314,326,333,340,348,355,362,374,381,389,397,405,413,425,433,442,454,461,469],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},958719,1,"单选题","某工程保护重要城镇向特别重要的供水对象供水，其工程规模及工程等别为( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","大(2)型I等工程",false,{"key":24,"text":25,"correct":22},"B","大(2)型Ⅱ等工程",{"key":27,"text":28,"correct":22},"C","大(1)型Ⅱ等工程",{"key":30,"text":31,"correct":32},"D","大(1)型Ⅰ等工程",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":36,"answer":20,"analysis":33},958720,[37,38,39,41],{"key":20,"text":31,"correct":32},{"key":24,"text":25,"correct":22},{"key":27,"text":40,"correct":22},"中型Ⅲ等工程",{"key":30,"text":42,"correct":22},"小(1)型Ⅳ等工程",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":45,"answer":27,"analysis":33},958721,[46,48,50,52],{"key":20,"text":47,"correct":22},"Ⅰ",{"key":24,"text":49,"correct":22},"Ⅱ",{"key":27,"text":51,"correct":32},"Ⅲ",{"key":30,"text":53,"correct":22},"Ⅳ",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":30,"analysis":33},958722,"根据防洪保护对象的重要性进行工程等别划分，当保护农田面积在30万～5万亩时，工程属于( )等工程。",[58,59,60,61],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":32},{"id":63,"libraryId":5,"type":15,"typeLabel":16,"stem":64,"options":65,"answer":20,"analysis":33},958723,"5级土石坝的洪水标准为( )。",[66,68,70,72],{"key":20,"text":67,"correct":32},"设计取重现期30～20年，校核取重现期300～200年",{"key":24,"text":69,"correct":22},"设计取重现期50～30年，校核取重现期1000～300年",{"key":27,"text":71,"correct":22},"设计取重现期100～50年，校核取重现期2000～1000年",{"key":30,"text":73,"correct":22},"设计取重现期500～100年，校核取重现期5000～2000年",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":27,"analysis":33},958724,"初定水利工程管理方案，是( )阶段的主要内容之一。",[78,80,82,84],{"key":20,"text":79,"correct":22},"项目建议书",{"key":24,"text":81,"correct":22},"预可行性研究",{"key":27,"text":83,"correct":32},"可行性研究",{"key":30,"text":85,"correct":22},"初步设计",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":88,"answer":30,"analysis":33},958725,[89,91,93,95],{"key":20,"text":90,"correct":22},"2",{"key":24,"text":92,"correct":22},"3",{"key":27,"text":94,"correct":22},"4",{"key":30,"text":96,"correct":32},"5",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":27,"analysis":33},958726,"根据防洪保护对象的重要性进行工程等别划分，当保护农田面积在100万～30万亩时，工程属于( )等工程。",[101,102,103,104],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":32},{"key":30,"text":53,"correct":22},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":107,"answer":20,"analysis":33},958727,[108,110,112,114],{"key":20,"text":109,"correct":32},"小(1)型",{"key":24,"text":111,"correct":22},"大(1)型",{"key":27,"text":113,"correct":22},"小(2)型",{"key":30,"text":115,"correct":22},"大(2)型",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},958728,"评价工程建设对环境的影响，是( )阶段的主要内容之一。",[120,121,122,123],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":83,"correct":32},{"key":30,"text":85,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},958729,"根据灌溉效益进行工程等别划分，当灌溉面积在150万～50万亩时，工程属于( )等工程。",[128,129,130,131],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":32},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},958730,"堤防工程级别根据堤防工程的防洪标准确定，当堤防的防洪标准大于等于50年又小于100年时，堤防工程级别为( )级。",[136,138,139,140],{"key":20,"text":137,"correct":22},"1",{"key":24,"text":90,"correct":32},{"key":27,"text":92,"correct":22},{"key":30,"text":94,"correct":22},{"id":142,"libraryId":5,"type":143,"typeLabel":144,"stem":145,"options":146,"answer":155,"analysis":33},958731,2,"多选题","灌溉、排水泵站的等别，应根据其( )确定。",[147,149,151,153],{"key":20,"text":148,"correct":22},"装机容量",{"key":24,"text":150,"correct":32},"装机功率",{"key":27,"text":152,"correct":32},"装机流量",{"key":30,"text":154,"correct":22},"工程规模","BC",{"id":157,"libraryId":5,"type":143,"typeLabel":144,"stem":158,"options":159,"answer":168,"analysis":33},958732,"超过90m高的2级土石坝设计时( )。",[160,162,164,166],{"key":20,"text":161,"correct":32},"按1级设计",{"key":24,"text":163,"correct":22},"按2级设计",{"key":27,"text":165,"correct":32},"洪水标准不变",{"key":30,"text":167,"correct":22},"洪水标准提高","AC",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":171,"answer":30,"analysis":33},958733,[172,173,174,175],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":32},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":178,"answer":24,"analysis":33},958734,[179,180,181,182],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":32},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":24,"analysis":33},958735,"3级灌溉和治涝工程永久性水工建筑物的洪水标准为( )。",[187,189,191,193],{"key":20,"text":188,"correct":22},"设计取重现期20～10年",{"key":24,"text":190,"correct":32},"设计取重现期50～30年",{"key":27,"text":192,"correct":22},"设计取重现期30～20年",{"key":30,"text":194,"correct":22},"设计取重现期100～50年",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":24,"analysis":33},958736,"3级水电站厂房的洪水标准为( )。",[199,201,203,205],{"key":20,"text":200,"correct":22},"设计取重现期50～30年，校核取重现期100年",{"key":24,"text":202,"correct":32},"设计取重现期100～50年，校核取重现期200年",{"key":27,"text":204,"correct":22},"设计取重现期200～100年，校核取重现期500年",{"key":30,"text":206,"correct":22},"设计取重现期200年，校核取重现期1000年",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},958737,"3级土石坝的洪水标准为( )。",[211,212,213,215],{"key":20,"text":71,"correct":32},{"key":24,"text":73,"correct":22},{"key":27,"text":214,"correct":22},"设计取重现期1000～500年，校核取可能最大洪水(PM或10000～5000年",{"key":30,"text":69,"correct":22},{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":218,"answer":30,"analysis":33},958738,[219,220,221,222],{"key":20,"text":31,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":40,"correct":22},{"key":30,"text":42,"correct":32},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":225,"answer":30,"analysis":33},958739,[226,227,228,229],{"key":20,"text":137,"correct":22},{"key":24,"text":90,"correct":22},{"key":27,"text":92,"correct":22},{"key":30,"text":94,"correct":32},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},958740,"根据治涝效益进行工程等别划分，当治涝面积大于等于200万亩时，工程属于( )等工程。",[234,235,236,237],{"key":20,"text":47,"correct":32},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},958741,"Ⅳ等工程的永久性水工建筑物级别，主要建筑物与次要建筑物级别下列说法正确的是( )。",[242,244,246,248],{"key":20,"text":243,"correct":22},"主要建筑物为4级，次要建筑物为2级",{"key":24,"text":245,"correct":22},"主要建筑物为4级，次要建筑物为3级",{"key":27,"text":247,"correct":22},"主要建筑物为4级，次要建筑物为4级",{"key":30,"text":249,"correct":32},"主要建筑物为4级，次要建筑物为5级",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":252,"answer":24,"analysis":33},958742,[253,254,256,257],{"key":20,"text":42,"correct":22},{"key":24,"text":255,"correct":32},"小(2)型Ⅴ等工程",{"key":27,"text":40,"correct":22},{"key":30,"text":25,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":260,"answer":27,"analysis":33},958743,[261,262,263,265],{"key":20,"text":109,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":264,"correct":32},"中型",{"key":30,"text":113,"correct":22},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},958744,"2级土石坝的洪水标准为( )。",[270,271,272,273],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":32},{"key":27,"text":214,"correct":22},{"key":30,"text":69,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},958745,"灌溉、排水泵站的等别，根据其装机功率确定，当装机功率为3万～1万kW时，灌溉、排水泵站工程为( )。",[278,279,280,281],{"key":20,"text":31,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":40,"correct":22},{"key":30,"text":42,"correct":22},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":284,"answer":30,"analysis":33},958746,[285,286,287,288],{"key":20,"text":109,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":264,"correct":22},{"key":30,"text":115,"correct":32},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},958747,"1级土石坝的洪水标准为( )。",[293,294,295,296],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":22},{"key":27,"text":214,"correct":32},{"key":30,"text":297,"correct":22},"A.设计取重现期50～30年，校核取重现期1000～300年",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},958748,"根据供水对象的重要性进行工程等别划分，对重要的供水对象，工程属于( )等工程。",[302,303,304,305],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":32},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},958749,"初步确定工程等别及主要建筑物级别、相应的洪水标准和地震设防烈度，是( )阶段的主要内容之一。",[310,311,312,313],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":32},{"key":27,"text":83,"correct":22},{"key":30,"text":85,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":30,"analysis":33},958750,"1级混凝土坝的洪水标准为( )。",[318,320,322,324],{"key":20,"text":319,"correct":22},"设计取重现期50～30年，校核取重现期500～200年",{"key":24,"text":321,"correct":22},"设计取重现期100～50年，校核取重现期1000～500年",{"key":27,"text":323,"correct":22},"设计取重现期500～100年，校核取重现期2000～1000年",{"key":30,"text":325,"correct":32},"设计取重现期1000～500年，校核取重现期5000～2000年",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":328,"answer":24,"analysis":33},958751,[329,330,331,332],{"key":20,"text":137,"correct":22},{"key":24,"text":90,"correct":32},{"key":27,"text":92,"correct":22},{"key":30,"text":94,"correct":22},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":335,"answer":24,"analysis":33},958752,[336,337,338,339],{"key":20,"text":31,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":40,"correct":22},{"key":30,"text":42,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},958753,"估算工程静态总投资和工程总投资，是( )阶段的主要内容之一。",[344,345,346,347],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":32},{"key":27,"text":83,"correct":22},{"key":30,"text":85,"correct":22},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":350,"answer":27,"analysis":33},958754,[351,352,353,354],{"key":20,"text":137,"correct":22},{"key":24,"text":90,"correct":22},{"key":27,"text":92,"correct":32},{"key":30,"text":94,"correct":22},{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":357,"answer":24,"analysis":33},958755,[358,359,360,361],{"key":20,"text":137,"correct":22},{"key":24,"text":90,"correct":32},{"key":27,"text":92,"correct":22},{"key":30,"text":94,"correct":22},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},958756,"失事后造成损失不大的水利水电工程的1～4级主要永久性水工建筑物，经过论证并报主管部门批准，其级别可( )。",[366,368,370,372],{"key":20,"text":367,"correct":22},"提高一级",{"key":24,"text":369,"correct":32},"降低一级",{"key":27,"text":371,"correct":22},"不变",{"key":30,"text":373,"correct":22},"提高一级，但洪水标准可不提高",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":376,"answer":20,"analysis":33},958757,[377,378,379,380],{"key":20,"text":31,"correct":32},{"key":24,"text":25,"correct":22},{"key":27,"text":40,"correct":22},{"key":30,"text":42,"correct":22},{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":27,"analysis":33},958758,"初选机组、电气主接线及其他主要机电设备和布置，是( )阶段的主要内容之一。",[385,386,387,388],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":83,"correct":32},{"key":30,"text":85,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":30,"analysis":33},958759,"堤防工程级别根据堤防工程的防洪标准确定，当堤防的防洪标准大于等于10年又小于20年时，堤防工程级别为( )级。",[393,394,395,396],{"key":20,"text":90,"correct":22},{"key":24,"text":92,"correct":22},{"key":27,"text":94,"correct":22},{"key":30,"text":96,"correct":32},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},958760,"估算主要工程量和建材需要量，估算工程投资，是( )阶段的主要内容之一。",[401,402,403,404],{"key":20,"text":79,"correct":32},{"key":24,"text":81,"correct":22},{"key":27,"text":83,"correct":22},{"key":30,"text":85,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},958761,"论述工程建设的必要性，确定本工程建设任务和综合利用的主次顺序是( )阶段的主要内容之一。",[409,410,411,412],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":83,"correct":32},{"key":30,"text":85,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},958762,"水利水电工程设计一般分为( )等阶段。",[417,419,421,423],{"key":20,"text":418,"correct":32},"项目建议书、可行性研究报告、初步设计、招标设计和施工详图设计",{"key":24,"text":420,"correct":22},"项目建议书、预可行性研究报告、可行性研究报告、初步设计、招标设计、施工详图设计",{"key":27,"text":422,"correct":22},"项目建议书、预可行性研究报告、详细可行性研究报告、初步设计、技施设计、施工图设计",{"key":30,"text":424,"correct":22},"可行性研究报告、初步设计、招标设计和施工详图设计",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},958763,"3级混凝土坝的洪水标准为( )。",[429,430,431,432],{"key":20,"text":319,"correct":22},{"key":24,"text":321,"correct":32},{"key":27,"text":323,"correct":22},{"key":30,"text":325,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":30,"analysis":33},958764,"根据防洪保护对象的重要性进行工程等别划分，当保护农田面积小于5万亩时，工程属于( )等工程。",[437,438,439,440],{"key":20,"text":49,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":53,"correct":22},{"key":30,"text":441,"correct":32},"Ⅴ",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},958765,"山区、丘陵区水利水电工程的永久性泄水建筑物消能防冲设计的洪水标准，根据泄水建筑物的级别确定，3级泄水建筑物的取重现期为( )年重现期。",[446,448,450,452],{"key":20,"text":447,"correct":22},"20",{"key":24,"text":449,"correct":32},"30",{"key":27,"text":451,"correct":22},"50",{"key":30,"text":453,"correct":22},"100",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":456,"answer":24,"analysis":33},958766,[457,458,459,460],{"key":20,"text":31,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":40,"correct":22},{"key":30,"text":42,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},958767,"初步调查和评价影响工程建设的主要地质条件和主要工程地质问题，是( )阶段的主要内容之一。",[465,466,467,468],{"key":20,"text":79,"correct":32},{"key":24,"text":81,"correct":22},{"key":27,"text":83,"correct":22},{"key":30,"text":85,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},958768,"可行性研究报告经批准后，是确定建设项目、编制( )文件的依据。",[473,474,475,477],{"key":20,"text":79,"correct":22},{"key":24,"text":85,"correct":32},{"key":27,"text":476,"correct":22},"招标设计",{"key":30,"text":478,"correct":22},"施工详图设计",[480,483,486,489,492,495],{"id":15,"name":481,"category":7,"favorite":482},"领导干部任职前廉政法规知识测试题",92,{"id":484,"name":485,"category":7,"favorite":15},595,"建筑结构与设备",{"id":487,"name":488,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":490,"name":491,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":493,"name":494,"category":7,"favorite":8},534,"BIM工程师",{"id":496,"name":494,"category":7,"favorite":8},535]