[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":493},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,13,50,1656,[13,34,42,50,58,70,82,90,99,110,118,126,134,145,153,161,169,180,195,208,220,232,243,250,262,271,283,295,304,312,320,328,336,348,360,368,379,386,394,402,410,418,426,435,447,454,461,469,477,485],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},958669,1,"单选题","初选主要建筑物的基本型式，提出工程总布置初步方案，是( )阶段的主要内容之一。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目建议书",true,{"key":24,"text":25,"correct":26},"B","预可行性研究",false,{"key":28,"text":29,"correct":26},"C","可行性研究",{"key":31,"text":32,"correct":26},"D","初步设计","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},958670,"选定基本坝型和主要建筑物的基本型式，初选工程总体布置，是( )阶段的主要内容之一。",[38,39,40,41],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":24,"analysis":33},958671,"搜集、整编与分析气象、水文、泥沙等资料，提出水文、泥沙参数和成果，是( )阶段的主要内容之一。",[46,47,48,49],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":51,"libraryId":5,"type":15,"typeLabel":16,"stem":52,"options":53,"answer":28,"analysis":33},958672,"基本选定工程规模，是( )阶段的主要内容之一。",[54,55,56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},958673,"根据防洪保护对象的重要性进行工程等别划分，当保护农田面积不小于500万亩时，工程属于( )等工程。",[62,64,66,68],{"key":20,"text":63,"correct":22},"Ⅰ",{"key":24,"text":65,"correct":26},"Ⅱ",{"key":28,"text":67,"correct":26},"Ⅲ",{"key":31,"text":69,"correct":26},"Ⅳ",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},958674,"Ⅱ等工程的永久性水工建筑物级别，主要建筑物与次要建筑物级别下列说法正确的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"主要建筑物为2级，次要建筑物为1级",{"key":24,"text":77,"correct":26},"主要建筑物为2级，次要建筑物为2级",{"key":28,"text":79,"correct":22},"主要建筑物为2级，次要建筑物为3级",{"key":31,"text":81,"correct":26},"主要建筑物为2级，次要建筑物为4级",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},958675,"提出资金筹措设想，是( )阶段的主要内容之一。",[86,87,88,89],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},958676,"根据治涝效益进行工程等别划分，当治涝面积小于3万亩时，工程属于( )等工程。",[94,95,96,97],{"key":20,"text":65,"correct":26},{"key":24,"text":67,"correct":26},{"key":28,"text":69,"correct":26},{"key":31,"text":98,"correct":22},"Ⅴ",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":24,"analysis":33},958677,"初步设计应根据主管部门批准的( )进行编制。",[103,104,106,108],{"key":20,"text":21,"correct":26},{"key":24,"text":105,"correct":22},"可行性研究报告",{"key":28,"text":107,"correct":26},"招标设计",{"key":31,"text":109,"correct":26},"施工详图设计",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":31,"analysis":33},958678,"编制初步设计概算，利用外资的工程应编制外资概算，是( )阶段的主要内容之一。",[114,115,116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},958679,"项目建议书被批准后，将作为项目列入国家中、长期经济发展计划，是( )工作的依据。",[122,123,124,125],{"key":20,"text":105,"correct":22},{"key":24,"text":32,"correct":26},{"key":28,"text":107,"correct":26},{"key":31,"text":109,"correct":26},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},958680,"确定水库淹没、工程占地的范围；核实水库淹没实物指标及工程占地范围的实物指标；提出水库淹没处理、专项处理、移民安置规划和投资概算，是( )阶段的主要内容之一。",[130,131,132,133],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":136,"answer":20,"analysis":33},958681,[137,139,141,143],{"key":20,"text":138,"correct":22},"小(2)型Ⅴ等工程",{"key":24,"text":140,"correct":26},"大(2)型Ⅱ等工程",{"key":28,"text":142,"correct":26},"中型Ⅲ等工程",{"key":31,"text":144,"correct":26},"小(1)型Ⅳ等工程",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":28,"analysis":33},958682,"选定水土保持设计方案，是( )阶段的主要内容之一。",[149,150,151,152],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},958683,"进行初步的国民经济评价和初步的财务评价，是( )阶段的主要内容之一。",[157,158,159,160],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},958684,"初步确定工程等别及主要建筑物级别和相应的洪水标准，是( )阶段的主要内容之一。",[165,166,167,168],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":171,"answer":28,"analysis":33},958685,[172,174,176,178],{"key":20,"text":173,"correct":26},"小(1)型",{"key":24,"text":175,"correct":26},"大(1)型",{"key":28,"text":177,"correct":22},"小(2)型",{"key":31,"text":179,"correct":26},"大(2)型",{"id":181,"libraryId":5,"type":182,"typeLabel":183,"stem":184,"options":185,"answer":194,"analysis":33},958686,2,"多选题","水利水电工程永久性建筑物的级别，应根据其所在工程的等别和建筑物的重要性确定，一般来说同一工程中主要建筑物要比次要建筑物级别高，因此( )。",[186,188,190,192],{"key":20,"text":187,"correct":22},"Ⅱ等工程的主要建筑物为2级，次要建筑物为3级",{"key":24,"text":189,"correct":22},"Ⅲ等工程的主要建筑物为3级，次要建筑物为4级",{"key":28,"text":191,"correct":22},"Ⅳ等工程的主要建筑物为4级，次要建筑物为5级",{"key":31,"text":193,"correct":26},"Ⅴ等工程的主要建筑物为5级，次要建筑物为6级","ABC",{"id":196,"libraryId":5,"type":182,"typeLabel":183,"stem":197,"options":198,"answer":207,"analysis":33},958687,"超过130m高的2级混凝土坝设计时( )。",[199,201,203,205],{"key":20,"text":200,"correct":22},"按1级设计",{"key":24,"text":202,"correct":26},"按2级设计",{"key":28,"text":204,"correct":22},"洪水标准不变",{"key":31,"text":206,"correct":26},"洪水标准提高","AC",{"id":209,"libraryId":5,"type":182,"typeLabel":183,"stem":210,"options":211,"answer":194,"analysis":33},958688,"水电工程设计阶段的调整内容( )。",[212,214,216,218],{"key":20,"text":213,"correct":22},"增加预可行性研究报告阶段",{"key":24,"text":215,"correct":22},"将原有可行性研究和初步设计两阶段合并",{"key":28,"text":217,"correct":22},"取消原初步设计阶段",{"key":31,"text":219,"correct":26},"增加技施设计阶段",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},958689,"3级供水工程永久性水工建筑物的洪水标准为( )。",[224,226,228,230],{"key":20,"text":225,"correct":26},"设计取重现期20～10年，校核取重现期50～30年",{"key":24,"text":227,"correct":22},"设计取重现期30～20年，校核取重现期100～50年",{"key":28,"text":229,"correct":26},"设计取重现期50～30年，校核取重现期200～100年",{"key":31,"text":231,"correct":26},"设计取重现期100～50年，校核取重现期300～200年",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":234,"answer":24,"analysis":33},958690,[235,237,239,241],{"key":20,"text":236,"correct":26},"1",{"key":24,"text":238,"correct":22},"2",{"key":28,"text":240,"correct":26},"3",{"key":31,"text":242,"correct":26},"4",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":245,"answer":31,"analysis":33},958691,[246,247,248,249],{"key":20,"text":236,"correct":26},{"key":24,"text":238,"correct":26},{"key":28,"text":240,"correct":26},{"key":31,"text":242,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},958692,"5级水电站厂房的洪水标准为( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"设计取重现期30～20年，校核取重现期50年",{"key":24,"text":257,"correct":26},"设计取重现期50～30年，校核取重现期100年",{"key":28,"text":259,"correct":26},"设计取重现期100～50年，校核取重现期200年",{"key":31,"text":261,"correct":26},"设计取重现期200～100年，校核取重现期500年",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},958693,"4级水电站厂房的洪水标准为( )。",[266,267,268,269],{"key":20,"text":257,"correct":22},{"key":24,"text":259,"correct":26},{"key":28,"text":261,"correct":26},{"key":31,"text":270,"correct":26},"设计取重现期200年，校核取重现期1000年",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},958694,"1级灌溉和治涝工程永久性水工建筑物的洪水标准为( )。",[275,277,279,281],{"key":20,"text":276,"correct":26},"设计取重现期20～10年",{"key":24,"text":278,"correct":26},"设计取重现期50～30年",{"key":28,"text":280,"correct":26},"设计取重现期30～20年",{"key":31,"text":282,"correct":22},"设计取重现期100～50年",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},958695,"2级土石坝，坝高超过90m时，其级别可( )。",[287,289,291,293],{"key":20,"text":288,"correct":26},"提高到1级",{"key":24,"text":290,"correct":26},"降低到3级",{"key":28,"text":292,"correct":26},"不变",{"key":31,"text":294,"correct":22},"提高到1级，但洪水标准可不提高",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},958696,"灌溉、排水泵站的等别，根据其装机功率确定，当装机功率为0.1万～0.01万kW时，灌溉、排水泵站工程为( )。",[299,301,302,303],{"key":20,"text":300,"correct":26},"大(1)型Ⅰ等工程",{"key":24,"text":140,"correct":26},{"key":28,"text":142,"correct":26},{"key":31,"text":144,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},958697,"灌溉、排水泵站的等别，根据其装机功率确定，当装机功率大于等于3万kW时，灌溉、排水泵站工程为( )。",[308,309,310,311],{"key":20,"text":300,"correct":22},{"key":24,"text":140,"correct":26},{"key":28,"text":142,"correct":26},{"key":31,"text":144,"correct":26},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},958698,"根据供水对象的重要性进行工程等别划分，对特别重要的供水对象，工程属于( )等工程。",[316,317,318,319],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},958699,"根据发电效益进行工程等别划分，当装机容量在5万～1万kW时，工程属于( )等工程。",[324,325,326,327],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":22},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},958700,"4级供水工程永久性水工建筑物的洪水标准为( )。",[332,333,334,335],{"key":20,"text":225,"correct":22},{"key":24,"text":227,"correct":26},{"key":28,"text":229,"correct":26},{"key":31,"text":231,"correct":26},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},958701,"4级土石坝的洪水标准为( )。",[340,342,344,346],{"key":20,"text":341,"correct":26},"设计取重现期100～50年，校核取重现期2000～1000年",{"key":24,"text":343,"correct":26},"设计取重现期500～100年，校核取重现期5000～2000年",{"key":28,"text":345,"correct":26},"设计取重现期1000～500年，校核取可能最大洪水(PM或10000～5000年",{"key":31,"text":347,"correct":22},"设计取重现期50～30年，校核取重现期1000～300年",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},958702,"山区、丘陵区水利水电工程的永久性泄水建筑物消能防冲设计的洪水标准，根据泄水建筑物的级别确定，1级泄水建筑物的取重现期为( )年重现期。",[352,354,356,358],{"key":20,"text":353,"correct":26},"20",{"key":24,"text":355,"correct":26},"30",{"key":28,"text":357,"correct":26},"50",{"key":31,"text":359,"correct":22},"100",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":362,"answer":31,"analysis":33},958703,[363,364,365,366],{"key":20,"text":238,"correct":26},{"key":24,"text":240,"correct":26},{"key":28,"text":242,"correct":26},{"key":31,"text":367,"correct":22},"5",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},958704,"3级土石坝，坝高超过70m时，其级别可( )。",[372,374,376,377],{"key":20,"text":373,"correct":26},"提高到2级",{"key":24,"text":375,"correct":26},"降低到4级",{"key":28,"text":292,"correct":26},{"key":31,"text":378,"correct":22},"提高到2级，但洪水标准可不提高",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":381,"answer":20,"analysis":33},958705,[382,383,384,385],{"key":20,"text":236,"correct":22},{"key":24,"text":238,"correct":26},{"key":28,"text":240,"correct":26},{"key":31,"text":242,"correct":26},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},958706,"根据供水对象的重要性选行工程等别划分，对一般的供水对象，工程属于( )等工程。",[390,391,392,393],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":22},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},958707,"根据发电效益进行工程等别划分，当装机容量在120万～30万kW时，工程属于( )等工程。",[398,399,400,401],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},958708,"灌溉、排水泵站的等别，根据其装机功率确定，当装机功率小于0.01万kW时，灌溉、排水泵站工程为( )。",[406,407,408,409],{"key":20,"text":300,"correct":26},{"key":24,"text":138,"correct":22},{"key":28,"text":142,"correct":26},{"key":31,"text":144,"correct":26},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},958709,"某工程保护中等城镇向一般供水对象供水，其工程规模及工程等别为( )。",[414,415,416,417],{"key":20,"text":138,"correct":26},{"key":24,"text":144,"correct":26},{"key":28,"text":142,"correct":22},{"key":31,"text":140,"correct":26},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},958710,"根据发电效益进行工程等别划分，当装机容量不小于120万kW时，工程属于( )等工程。",[422,423,424,425],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},958711,"山区、丘陵区水利水电工程的永久性泄水建筑物消能防冲设计的洪水标准，根据泄水建筑物的级别确定，5级泄水建筑物的取重现期为( )年重现期。",[430,432,433,434],{"key":20,"text":431,"correct":22},"10",{"key":24,"text":353,"correct":26},{"key":28,"text":355,"correct":26},{"key":31,"text":357,"correct":26},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},958712,"5级混凝土坝的洪水标准为( )。",[439,441,443,445],{"key":20,"text":440,"correct":22},"设计取重现期30～20年，校核取重现期200～100年",{"key":24,"text":442,"correct":26},"设计取重现期50～30年，校核取重现期500～200年",{"key":28,"text":444,"correct":26},"设计取重现期100～50年，校核取重现期1000～500年",{"key":31,"text":446,"correct":26},"设计取重现期500～100年，校核取重现期2000～1000年",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":449,"answer":31,"analysis":33},958713,[450,451,452,453],{"key":20,"text":300,"correct":26},{"key":24,"text":140,"correct":26},{"key":28,"text":142,"correct":26},{"key":31,"text":144,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":456,"answer":28,"analysis":33},958714,[457,458,459,460],{"key":20,"text":300,"correct":26},{"key":24,"text":140,"correct":26},{"key":28,"text":142,"correct":22},{"key":31,"text":144,"correct":26},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},958715,"根据供水对象的重要性进行工程等别划分，对中等的供水对象，工程属于( )等工程。",[465,466,467,468],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":26},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":28,"analysis":33},958716,"根据灌溉效益进行工程等别划分，当灌溉面积在50万～5万亩时，工程属于( )等工程。",[473,474,475,476],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":26},{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},958717,"根据灌溉效益进行工程等别划分，当灌溉面积在5万～0.5万亩时，工程属于( )等工程。",[481,482,483,484],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":22},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},958718,"根据发电效益进行工程等别划分，当装机容量小于1万kW时，工程属于( )等工程。",[489,490,491,492],{"key":20,"text":65,"correct":26},{"key":24,"text":67,"correct":26},{"key":28,"text":69,"correct":26},{"key":31,"text":98,"correct":22},[494,497,500,503,506,509],{"id":15,"name":495,"category":7,"favorite":496},"领导干部任职前廉政法规知识测试题",92,{"id":498,"name":499,"category":7,"favorite":15},595,"建筑结构与设备",{"id":501,"name":502,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":504,"name":505,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":507,"name":508,"category":7,"favorite":8},534,"BIM工程师",{"id":510,"name":508,"category":7,"favorite":8},535]