[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":537},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,12,50,1656,[13,34,46,57,69,80,91,103,114,125,136,148,160,172,184,196,211,223,234,246,259,271,280,292,304,312,320,330,342,355,367,375,383,391,399,407,414,422,430,441,452,460,468,476,484,492,503,511,519,530],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},958619,1,"单选题","对地下水分类有许多种方法，常用的是将地下水资源分为天然资源和开采资源，而天然资源又分为天然补给量和天然排泄量，天然补给量又分为垂向补给量和侧向补给量，以下( )是垂向补给量。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","大气降水入渗量",true,{"key":24,"text":25,"correct":26},"B","地下径流流入量",false,{"key":28,"text":29,"correct":26},"C","地下径流流出量",{"key":31,"text":32,"correct":26},"D","泉水溢出量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},958620,"河流的长度、比降属于( )。",[38,40,42,44],{"key":20,"text":39,"correct":26},"自然地理资料",{"key":24,"text":41,"correct":22},"流域特征资料",{"key":28,"text":43,"correct":26},"气象资料",{"key":31,"text":45,"correct":26},"泥沙资料",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":48,"answer":31,"analysis":33},958621,[49,51,53,55],{"key":20,"text":50,"correct":26},"9",{"key":24,"text":52,"correct":26},"9.1",{"key":28,"text":54,"correct":26},"10",{"key":31,"text":56,"correct":22},"10.2",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":31,"analysis":33},958622,"地表水体包括( )，地表水资源量通常用地表水体的动态水量即河川径流量来表示。",[61,63,65,67],{"key":20,"text":62,"correct":26},"大气水",{"key":24,"text":64,"correct":26},"生物水",{"key":28,"text":66,"correct":26},"液态水",{"key":31,"text":68,"correct":22},"河流水、湖泊水、冰川水和沼泽水",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":71,"answer":28,"analysis":33},958623,[72,74,76,78],{"key":20,"text":73,"correct":26},"127.5",{"key":24,"text":75,"correct":26},"137.5",{"key":28,"text":77,"correct":22},"147.5",{"key":31,"text":79,"correct":26},"175.5",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":82,"answer":20,"analysis":33},958624,[83,85,87,89],{"key":20,"text":84,"correct":22},"610",{"key":24,"text":86,"correct":26},"617",{"key":28,"text":88,"correct":26},"627",{"key":31,"text":90,"correct":26},"650",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},958625,"在地下水径流条件较差，以垂直补给为主的潜水分布区，可利用地下水长期动态观测资料，分析由于降水入渗补给引起的地下水水位上升幅度，以推求降水入渗补给量。已知水位变化带岩层的给水度μ=0.02，计算面积F=10000㎡，年内降水入渗引起的地下水位累积上升幅度∑ΔH=1m，则日均降雨入渗补给量Q为( )m3",[95,97,99,101],{"key":20,"text":96,"correct":22},"0.548",{"key":24,"text":98,"correct":26},"0.555",{"key":28,"text":100,"correct":26},"0.648",{"key":31,"text":102,"correct":26},"0.758",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":105,"answer":24,"analysis":33},958626,[106,108,110,112],{"key":20,"text":107,"correct":26},"0.17",{"key":24,"text":109,"correct":22},"0.18",{"key":28,"text":111,"correct":26},"0.19",{"key":31,"text":113,"correct":26},"0.20",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":116,"answer":28,"analysis":33},958627,[117,119,121,123],{"key":20,"text":118,"correct":26},"14.24",{"key":24,"text":120,"correct":26},"18.53",{"key":28,"text":122,"correct":22},"21.82",{"key":31,"text":124,"correct":26},"24.49",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":127,"answer":20,"analysis":33},958628,[128,130,132,134],{"key":20,"text":129,"correct":22},"0.06565",{"key":24,"text":131,"correct":26},"0.07000",{"key":28,"text":133,"correct":26},"0.08565",{"key":31,"text":135,"correct":26},"0.1606",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},958629,"水利水电工程设计划分调整后分为( )等阶段。",[140,142,144,146],{"key":20,"text":141,"correct":26},"项目建议书、可行性研究报告、初步设计、招标设计和施工详图设计",{"key":24,"text":143,"correct":22},"项目建议书、预可行性研究报告、可行性研究报告、招标设计、施工详图设计",{"key":28,"text":145,"correct":26},"可行性研究报告、初步设计、招标设计和施工详图设计",{"key":31,"text":147,"correct":26},"项目建议书、预可行性研究报告、详细可行性研究报告、初步设计、技施设计、施工图设计",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},958630,"水库的总库容系指( )以下的水库库容。",[152,154,156,158],{"key":20,"text":153,"correct":26},"设计洪水位",{"key":24,"text":155,"correct":22},"校核洪水位",{"key":28,"text":157,"correct":26},"正常蓄水位",{"key":31,"text":159,"correct":26},"汛前限制水位",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":28,"analysis":33},958631,"枢纽布置应遵循的一般原则有( )条。",[164,166,168,170],{"key":20,"text":165,"correct":26},"5",{"key":24,"text":167,"correct":26},"6",{"key":28,"text":169,"correct":22},"7",{"key":31,"text":171,"correct":26},"8",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},958632,"地形、地质、施工、征地移民、建筑材料及综合效益等条件是( )选择时就考虑的主要因素。",[176,178,180,182],{"key":20,"text":177,"correct":22},"坝址",{"key":24,"text":179,"correct":26},"闸址",{"key":28,"text":181,"correct":26},"水电站厂房厂址",{"key":31,"text":183,"correct":26},"泵站厂址",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":28,"analysis":33},958633,"当采用隧洞引水发电时，根据地形条件，若河道的岩石质量较差，一般将引水发电系统布置在( )较为合理。",[188,190,192,194],{"key":20,"text":189,"correct":26},"凹岸",{"key":24,"text":191,"correct":26},"上游",{"key":28,"text":193,"correct":22},"凸岸",{"key":31,"text":195,"correct":26},"下游",{"id":197,"libraryId":5,"type":198,"typeLabel":199,"stem":200,"options":201,"answer":210,"analysis":33},958634,2,"多选题","坝址选择主要是根据地形、地质、施工、征地移民、建筑材料及综合效益等条件，初选几个坝址，通过不同的工程布置方案比较，确定各坝址的代表方案。综合比较各坝址代表方案，进行技术经济综合比较，选定工程坝址。选定坝址时，依据地形条件可确定( )。",[202,204,206,208],{"key":20,"text":203,"correct":22},"河谷狭窄，地质条件良好，适宜修建拱坝",{"key":24,"text":205,"correct":22},"河谷宽阔，地质条件较好，可以选用重力坝或支墩坝",{"key":28,"text":207,"correct":22},"河谷宽阔，河床覆盖层深厚或地质条件较差，且土石、砂砾等当地材料储量丰富，适宜修建土石坝",{"key":31,"text":209,"correct":22},"在高山峡谷地区布置水利枢纽，应尽量减少高边坡开挖","ABCD",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},958635,"当永久性水工建筑物基础的工程地质条件复杂或采用新型结构时，对2～5级建筑物，可( )。",[215,217,219,221],{"key":20,"text":216,"correct":26},"提高1级",{"key":24,"text":218,"correct":26},"降低1级",{"key":28,"text":220,"correct":26},"不变",{"key":31,"text":222,"correct":22},"提高1级，但洪水标准不予提高",{"id":224,"libraryId":5,"type":198,"typeLabel":199,"stem":225,"options":226,"answer":233,"analysis":33},958636,"地质条件复杂的2～5级建筑物设计时( )。",[227,228,230,231],{"key":20,"text":216,"correct":22},{"key":24,"text":229,"correct":26},"级别不变",{"key":28,"text":218,"correct":26},{"key":31,"text":232,"correct":22},"洪水标准不变","AD",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},958637,"按山区、丘陵区水利水电工程永久性水工建筑物洪水标准确定水工建筑物洪水标准的条件为( )。",[238,240,242,244],{"key":20,"text":239,"correct":26},"挡水高度低于15m，且上下游水头差小于10m时",{"key":24,"text":241,"correct":26},"挡水高度低于15m，或上下游水头差小于10m时",{"key":28,"text":243,"correct":26},"挡水高度大于15m，或上下游水头差小于10m时",{"key":31,"text":245,"correct":22},"挡水高度大于15m，且上下游水头差大于10m时",{"id":247,"libraryId":5,"type":198,"typeLabel":199,"stem":248,"options":249,"answer":258,"analysis":33},958638,"项目建议书是( )。",[250,252,254,256],{"key":20,"text":251,"correct":22},"基本建设程序中的一个重要环节",{"key":24,"text":253,"correct":22},"国家选择项目的依据",{"key":28,"text":255,"correct":26},"开展可行性研究工作的依据",{"key":31,"text":257,"correct":26},"作为项目列入国家中、长期经济发展计划","AB",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},958639,"水库总库容在10亿～1亿m3的工程其工程规模属于( )。",[263,265,267,269],{"key":20,"text":264,"correct":26},"小(1)型",{"key":24,"text":266,"correct":26},"大(1)型",{"key":28,"text":268,"correct":26},"中型",{"key":31,"text":270,"correct":22},"大(2)型",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":28,"analysis":33},958640,"水库总库容在0.01亿～0.001亿m3的工程其工程规模属于( )。",[275,276,277,279],{"key":20,"text":264,"correct":26},{"key":24,"text":266,"correct":26},{"key":28,"text":278,"correct":22},"小(2)型",{"key":31,"text":270,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},958641,"引水枢纽工程等别根据其引水流量的大小确定，当引水流量小于2m3\u002Fs时，引水枢纽工程为( )。",[284,286,288,290],{"key":20,"text":285,"correct":22},"小(2)型Ⅴ等工程",{"key":24,"text":287,"correct":26},"大(2)型Ⅱ等工程",{"key":28,"text":289,"correct":26},"中型Ⅲ等工程",{"key":31,"text":291,"correct":26},"小(1)型Ⅳ等工程",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},958642,"灌排建筑物的级别根据过水流量的大小确定，当过水流量大于300m3\u002Fs时，灌排建筑物的级别为( )级。",[296,298,300,302],{"key":20,"text":297,"correct":22},"1",{"key":24,"text":299,"correct":26},"2",{"key":28,"text":301,"correct":26},"3",{"key":31,"text":303,"correct":26},"4",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},958643,"穿堤水工建筑物的级别，按所在堤防工程的级别和与建筑物规模相应的级别高者确定。穿过2级堤防工程，引水流量30m3\u002Fs的水闸的级别为( )级。",[308,309,310,311],{"key":20,"text":297,"correct":26},{"key":24,"text":299,"correct":22},{"key":28,"text":301,"correct":26},{"key":31,"text":303,"correct":26},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":28,"analysis":33},958644,"灌排建筑物的级别根据过水流量的大小确定，当过水流量为100～20m3\u002Fs时，灌排建筑物的级别为( )级。",[316,317,318,319],{"key":20,"text":297,"correct":26},{"key":24,"text":299,"correct":26},{"key":28,"text":301,"correct":22},{"key":31,"text":303,"correct":26},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},958645,"灌溉、排水泵站的等别，根据其装机流量和装机功率确定，当装机流量小于2m3\u002Fs、装机功率小于0.01万kW时，灌溉、排水泵站工程为( )。",[324,326,328,329],{"key":20,"text":325,"correct":26},"大(1)型Ⅰ等工程",{"key":24,"text":327,"correct":22},"小(2)型V等工程",{"key":28,"text":289,"correct":26},{"key":31,"text":291,"correct":26},{"id":331,"libraryId":5,"type":198,"typeLabel":199,"stem":332,"options":333,"answer":258,"analysis":33},958646,"城市应根据( )分为4个等级。",[334,336,338,340],{"key":20,"text":335,"correct":22},"重要性",{"key":24,"text":337,"correct":22},"非农业人口数量",{"key":28,"text":339,"correct":26},"防护区人口数量",{"key":31,"text":341,"correct":26},"防护区耕地面积",{"id":343,"libraryId":5,"type":198,"typeLabel":199,"stem":344,"options":345,"answer":354,"analysis":33},958647,"城市应根据其社会经济地位的重要性或非农业人口的数量分为4个等级。下列说法正确的是( )。",[346,348,350,352],{"key":20,"text":347,"correct":22},"Ⅰ等城市指特别重要的城市或非农业人口不低于150万，防洪标准不低于200年一遇",{"key":24,"text":349,"correct":26},"Ⅱ等城市指特别重要的城市和非农业人口大于150万，防洪标准大于200年一遇",{"key":28,"text":351,"correct":22},"Ⅱ等城市指重要的城市或非农业人为150万～50万，防洪标准为200～100年一遇",{"key":31,"text":353,"correct":22},"Ⅳ等城市指一般城市或非农业人口不大于20万，防洪标准为50～20年一遇","ACD",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":28,"analysis":33},958648,"确定主要水文参数和成果，是( )阶段的主要内容之一。",[359,361,363,365],{"key":20,"text":360,"correct":26},"项目建议书",{"key":24,"text":362,"correct":26},"预可行性研究",{"key":28,"text":364,"correct":22},"可行性研究",{"key":31,"text":366,"correct":26},"初步设计",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},958649,"初定水库淹没、工程占地的范围；简述主要淹没实物指标；初拟移民安置；提出专项设施迁建的处理方案；初估补偿投资，是( )阶段的主要内容之一。",[371,372,373,374],{"key":20,"text":360,"correct":22},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},958650,"分析工程对环境产生的主要有利和不利的影响，从环境角度初步分析工程建设的可行性，是( )阶段的主要内容之一。",[379,380,381,382],{"key":20,"text":360,"correct":26},{"key":24,"text":362,"correct":22},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},958651,"复核水文成果，是( )阶段的主要内容之一。",[387,388,389,390],{"key":20,"text":360,"correct":26},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},958652,"提出主要工程量和建材需要量，估算工程投资，是( )阶段的主要内容之一。",[395,396,397,398],{"key":20,"text":360,"correct":26},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":22},{"key":31,"text":366,"correct":26},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},958653,"初拟对外交通运输方案；初拟施工导流方式、主体工程的主要施工方法和施工总布置；初拟施工总进度及控制性工期；简述分期实施意见，是( )阶段的主要内容之一。",[403,404,405,406],{"key":20,"text":360,"correct":22},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":409,"answer":24,"analysis":33},958654,[410,411,412,413],{"key":20,"text":325,"correct":26},{"key":24,"text":287,"correct":22},{"key":28,"text":289,"correct":26},{"key":31,"text":291,"correct":26},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},958655,"灌溉、排水泵站的等别，根据其装机功率确定，当装机功率为1万～0.1万kW时，灌溉、排水泵站工程为( )。",[418,419,420,421],{"key":20,"text":325,"correct":26},{"key":24,"text":287,"correct":26},{"key":28,"text":289,"correct":22},{"key":31,"text":291,"correct":26},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},958656,"初拟对外交通运输方案和场内交通干线布置；初拟施工导流方式、主体工程的主要施工方法；初拟施工总布置规划图；初排施工总进度；提出第一台机组发电年限和总工期，是( )阶段的主要内容之一。",[426,427,428,429],{"key":20,"text":360,"correct":26},{"key":24,"text":362,"correct":22},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},958657,"在水利水电工程等别划分时，Ⅲ等工程的工程规模属于( )工程。",[434,436,437,439],{"key":20,"text":435,"correct":26},"大型",{"key":24,"text":268,"correct":22},{"key":28,"text":438,"correct":26},"小型",{"key":31,"text":440,"correct":26},"不确定",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":443,"answer":20,"analysis":33},958658,[444,446,448,450],{"key":20,"text":445,"correct":22},"Ⅰ",{"key":24,"text":447,"correct":26},"Ⅱ",{"key":28,"text":449,"correct":26},"Ⅲ",{"key":31,"text":451,"correct":26},"Ⅳ",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},958659,"提出综合评价与结论，并提出今后工作的建议，是( )阶段的主要内容之一。",[456,457,458,459],{"key":20,"text":360,"correct":22},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},958660,"复核区域构造稳定，查明水库地质和建筑物工程地质条件、灌区水文地质条件及土壤特性，提出相应的评价和结论，是( )阶段的主要内容之一。",[464,465,466,467],{"key":20,"text":360,"correct":26},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":28,"analysis":33},958661,"根据治涝效益进行工程等别划分，当治涝面积在60万～15万亩时，工程属于( )等工程。",[472,473,474,475],{"key":20,"text":445,"correct":26},{"key":24,"text":447,"correct":26},{"key":28,"text":449,"correct":22},{"key":31,"text":451,"correct":26},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},958662,"初步提出建设项目管理方案，是( )阶段的主要内容之一。",[480,481,482,483],{"key":20,"text":360,"correct":22},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},958663,"堤防工程级别根据堤防工程的防洪标准确定，当堤防的防洪标准大于等于20年又小30年时，堤防工程级别为( )级。",[488,489,490,491],{"key":20,"text":297,"correct":26},{"key":24,"text":299,"correct":26},{"key":28,"text":301,"correct":26},{"key":31,"text":303,"correct":22},{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},958664,"2级混凝土坝或浆砌石坝，坝高超过130m时，其级别可( )。",[496,498,500,501],{"key":20,"text":497,"correct":26},"提高到1级",{"key":24,"text":499,"correct":26},"降低到3级",{"key":28,"text":220,"correct":26},{"key":31,"text":502,"correct":22},"提高到1级，但洪水标准可不提高",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},958665,"在水利水电工程等别划分时，Ⅰ、Ⅱ等工程的工程规模属于( )工程。",[507,508,509,510],{"key":20,"text":435,"correct":22},{"key":24,"text":268,"correct":26},{"key":28,"text":438,"correct":26},{"key":31,"text":440,"correct":26},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},958666,"简要分析工程建设对环境的有利与不利影响，是( )阶段的主要内容之一。",[515,516,517,518],{"key":20,"text":360,"correct":22},{"key":24,"text":362,"correct":26},{"key":28,"text":364,"correct":26},{"key":31,"text":366,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":28,"analysis":33},958667,"施工详图设计在( )基础上，针对各项工程具体施工要求，绘制施工详图。",[523,524,526,528],{"key":20,"text":360,"correct":26},{"key":24,"text":525,"correct":26},"可行性研究报告",{"key":28,"text":527,"correct":22},"初步设计和招标设计",{"key":31,"text":529,"correct":26},"技施设计",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":532,"answer":24,"analysis":33},958668,[533,534,535,536],{"key":20,"text":297,"correct":26},{"key":24,"text":299,"correct":22},{"key":28,"text":301,"correct":26},{"key":31,"text":303,"correct":26},[538,541,544,547,550,553],{"id":15,"name":539,"category":7,"favorite":540},"领导干部任职前廉政法规知识测试题",92,{"id":542,"name":543,"category":7,"favorite":15},595,"建筑结构与设备",{"id":545,"name":546,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":548,"name":549,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":551,"name":552,"category":7,"favorite":8},534,"BIM工程师",{"id":554,"name":552,"category":7,"favorite":8},535]