[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959696":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959696,695,2,"多选题","在项目申报阶段，申报内容应包括( )，同时报主管部门审批。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","移民安置规划",true,{"key":16,"text":17,"correct":14},"B","可行性研究报告",{"key":19,"text":20,"correct":14},"C","初步设计文件",{"key":22,"text":23,"correct":24},"D","地质勘探报告",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]