[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959683":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959683,695,1,"单选题","水利水电工程建设周期较长，征地移民应( )工程建设进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","同步",false,{"key":16,"text":17,"correct":18},"B","先于",true,{"key":20,"text":21,"correct":14},"C","稍后",{"key":23,"text":24,"correct":14},"D","以上答案都不对","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]