[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959677":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},959677,695,1,"单选题","移民搬迁和清库以及专业项目的迁(改)建，应根据水库蓄水和分期移民计划，按( )原则实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","先低后高、先下游后上游、先淹先迁",true,{"key":16,"text":17,"correct":18},"B","先高后低、先下游后上游、先淹后迁",false,{"key":20,"text":21,"correct":18},"C","先低后高、先上游后下游、先迁后淹",{"key":23,"text":24,"correct":18},"D","以上答案都不对","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]