[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959658":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959658,695,2,"多选题","“按原规模、原标准、恢复原有生产能力”的原则进行规划设计的有( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","移民安置规划",false,{"key":16,"text":17,"correct":14},"B","集(城)镇迁建规划",{"key":19,"text":20,"correct":21},"C","企业迁建规划",true,{"key":23,"text":24,"correct":21},"D","专业项目恢复","CD","A项，移民安置规划的原则按“原规模、原标准(等级)、恢复原功能”列入补偿投资(费用)概(估)算。B项，集(城)镇迁建规划本着“原规模、原标准”的原则，按照迁建规划设计成果分项计算。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]