[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959639":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959639,695,1,"单选题","农村小型水利电力设施补偿费，对农村的小型水电站、抽水泵站、排涝泵站、灌溉渠道、输变电工程、水库、水塘等设施，按原有规模和标准，结合移民安置规划，扣除( )后计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","国家规定的设备材料",false,{"key":16,"text":17,"correct":18},"B","可利用的设备材料",true,{"key":20,"text":21,"correct":14},"C","国家所有的设备材料",{"key":23,"text":24,"correct":14},"D","集体所有的设备材料","根据《大中型水利水电工程建设征地补偿和移民安置条例》规定，农村小型水利电力设施补偿费对农村的小型水电站、抽水泵站、排涝泵站、灌溉渠道、输变电工程、水库、水塘等设施，按原有规模和标准，结合移民安置规划，扣除可利用的设备材料后计算。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]