[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959638":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959638,695,1,"单选题","农村移民安置区的农业生产开发项目和配套的基础设施，应根据新开垦土地熟化期和相应基础设施工程的建设周期要求，( )开发建设。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","同步",false,{"key":16,"text":17,"correct":18},"B","提前",true,{"key":20,"text":21,"correct":14},"C","稍后",{"key":23,"text":24,"correct":14},"D","都不对","根据《大中型水利水电工程建设征地补偿和移民安置条例》规定，农村移民安置区的农业生产开发项目和配套的基础设施，应根据新开垦土地熟化期和相应基础设施工程的建设周期要求，提前开发建设。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]