[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959630":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},959630,695,1,"单选题","在回水影响不显著的坝前段，考虑风浪的影响，应取( )作为居民迁移和土地征用界限。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","风浪爬高",false,{"key":16,"text":17,"correct":14},"B","船行波浪高",{"key":19,"text":20,"correct":21},"C","以上二者中的较大值",true,{"key":23,"text":24,"correct":14},"D","比正常蓄水位高0.5～1.0m处","居民迁移和土地征用界线，应综合上述水库经常淹没、临时淹没以及浸没、塌岸、滑坡等影响范围的具体情况，遵循安全、经济，便于生产、生活的原则，全面分析论证确定。在回水影响不显著的坝前段，应计算风浪爬高、船行波浪高，取两者中的大值作为居民迁移和土地征用界限；不计算风浪爬高和船行波浪高时，居民迁移和土地征用界线可高于正常蓄水位0.5～1.0m。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]