[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959628":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959628,695,1,"单选题","可行性研究报告阶段农户抽样调查的样本数，移民区可取移民总户数的( )，移民安置区可取所在行政村原有居民总户数的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5%～8%、3%～5%",false,{"key":16,"text":17,"correct":18},"B","5%～8%、2%～3%",true,{"key":20,"text":21,"correct":14},"C","2%～3%、5%～8%",{"key":23,"text":24,"correct":14},"D","2%～3%、3%～5%","可行性研究报告阶段，移民区应以村、组为单位，收集资料并进行村民委员会或农村集体经济组织抽样调查、农户抽样调查；移民安置区以乡(镇)、村为单位，收集资料并进行村民委员会或农村集体经济组织抽样调查。农户抽样调查的样本数，移民区可取移民总户数的5%～8%，移民安置区可取所在行政村原有居民总户数的2%～3%。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]