[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959619":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959619,695,1,"单选题","移民安置规划的重点和难点是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","城镇和集镇迁建规划",false,{"key":16,"text":17,"correct":18},"B","农村移民安置规划",true,{"key":20,"text":21,"correct":14},"C","水库库区防护工程设计",{"key":23,"text":24,"correct":14},"D","企业迁建规划","农村移民安置规划是征地移民规划设计的重要组成部分，是移民安置规划的重点和难点。农村移民安置除需房屋重建和基础配套建设外，由于其赖以生存的生产资料——土地的淹没或占用，还需要为移民提供可替代的土地资源或提供其他新的就业机会。妥善解决农村移民安置问题，保证农村移民安居乐业，不仅能保护地区经济的发展和生态环境的改善，同时也是工程建设顺利进行和提高工程整体效益的关键因素之一。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]