[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959610":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959610,695,2,"多选题","各专业项目的恢复改建，应按( )，进行规划设计。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","原状态",false,{"key":16,"text":17,"correct":18},"B","原规模",true,{"key":20,"text":21,"correct":18},"C","原标准(等级)",{"key":23,"text":24,"correct":18},"D","恢复原功能","BCD","企业迁建应按“原规模、原标准、恢复原有生产能力”的原则进行规划设计，其主要内容包括选址论证、生产规模、厂(矿)区布置、土建工程和工艺流程设计、实施进度、投资概(估)算、分年投资计划及经济分析等，并提出规划设计书及图纸。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]