[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959600":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959600,695,2,"多选题","水库回水末端的设计终点位置的选取有( )两种方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","垂直斩断",true,{"key":16,"text":17,"correct":18},"B","水平斩断",false,{"key":20,"text":21,"correct":18},"C","垂直延伸",{"key":23,"text":24,"correct":14},"D","水平延伸","AD","水库回水末端的设计终点位置，在库尾回水曲线不高于同频率天然洪水水面线0.3m的范围内选取，有垂直斩断和水平延伸两种处理方法。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]