[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959533":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959533,695,2,"多选题","工程项目建设管理阶段包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目前期准备阶段",false,{"key":16,"text":17,"correct":18},"B","项目可行性研究阶段",true,{"key":20,"text":21,"correct":18},"C","项目建设实施阶段",{"key":23,"text":24,"correct":14},"D","项目竣工验收阶段","BC","工程项目建设管理是跨越整个工程项目全生命周期的管理，包括项目立项决策、可行性研究、设计、建设实施、运营及后评价等阶段，且各个阶段之间互相影响。整个工程项目建设管理中参与和涉及的主体是多方面的，有业主、设计、施工、监理及政府等相关管理部门。加强工程建设项目的管理，对保障工程质量、提高投资效益具有重要作用。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]