[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959531":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959531,695,2,"多选题","工程项目的特殊属性包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","目标明确",false,{"key":16,"text":17,"correct":18},"B","投资巨大",true,{"key":20,"text":21,"correct":14},"C","条件约束多",{"key":23,"text":24,"correct":18},"D","建设周期长","BD","工程项目一般是指为达到预期目标，投入一定量的资本，在一定的约束条件下，经过决策与实施的必要程序，从而形成固定资产的一次性任务。工程项目具有任务一次性、目标明确性和条件约束性三个基本特征，同时还具有投资巨大、建设周期长、风险大、不可逆和协作性要求高等特殊属性。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]