[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959514":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959514,695,2,"多选题","投标文件编制阶段的内容主要包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","制订投标总体方案",true,{"key":16,"text":17,"correct":14},"B","编制施工组织设计和施工进度与工期",{"key":19,"text":20,"correct":21},"C","保证工程质量、进度和施工安全的主要组织保证和技术措施",false,{"key":23,"text":24,"correct":14},"D","确定工程质量标准","ABD","投标文件编制阶段的内容主要包括：①制订投标总体方案；②复查、计算图纸工程量，分析材料供应情况；③编制施工组织设计和施工进度与工期；④确定工程质量标准；⑤编制或套用投标单价；⑥计算取费标准或确定采用的取费标准；⑦计算完成投标项目所需的成本，与按照招标文件、有关研究招标文件，熟悉图纸和其他有关技术资料的内容。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]