[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959432":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959432,695,2,"多选题","关于开发建设项目水土保持工程概(估)算编制的费用构成下列说法正确的有( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程措施及植物措施由直接工程费、间接费、企业利润和税金组成",true,{"key":16,"text":17,"correct":18},"B","独立费用由建设管理费、工程建设监理费、科研勘测设计费、征地及淹没补偿费、水土流失监测费及工程质量监督费组成",false,{"key":20,"text":21,"correct":14},"C","预备费由基本预备费和价差预备费组成",{"key":23,"text":24,"correct":14},"D","工程概(估)算总投资=工程措施投资+植物措施投资+施工临时工程投资+独立费用+预备费+水土保持设施补偿费","ACD","开发建设项目水土保持工程概(估)算编制的费用构成为工程措施及植物措施费由直接工程费、间接费、企业利润和税金组成；独立费用由建设管理费、工程建设监理费、科研勘测设计费、水土流失监测费组成。根据财综[2008]78号文，取消工程质量监督费；预备费由基本预备费和价差预备费组成；工程概(估)算总投资为工程措施投资、植物措施投资、施工临时工程投资、独立费用、预备费、水土保持设施补偿费之和。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]