[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959416":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959416,695,1,"单选题","下述说法错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","水土流失总治理度是指项目防治责任范围内的水土流失防治面积占防治责任范围内水土流失总面积的百分比",false,{"key":16,"text":17,"correct":18},"B","土壤流失控制比是指项目防治责任范围内治理后的最大土壤流失量与项目防治责任范围内的容许土壤流失量之比",true,{"key":20,"text":21,"correct":14},"C","拦渣率是指项目防治责任范围内实际拦挡弃土弃渣量与防治责任范围内弃土弃渣总量的百分比",{"key":23,"text":24,"correct":14},"D","扰动土地整治率是指项目防治责任范围内的扰动土地整治面积占扰动土地面积的百分比","水土流失总治理度是指在项目建设区内，水土流失治理达标面积占水土流失总面积的百分比；土壤流失控制比是指在项目建设区内，容许土壤流失量与治理后的平均土壤流失强度之比；拦渣率是指在项目建设区内，采取措施实际拦挡的弃土(石、渣)量与工程弃土(石、渣)总量的百分比；扰动土地整治率是指在项目建设区内，扰动土地整治面积占扰动土地总面积的百分比。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]