[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959402":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},959402,695,1,"单选题","根据有关法律法规的规定，基本建设项目的立项程序是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","直接报批项目规划设计报告即可立项",false,{"key":16,"text":17,"correct":14},"B","只需做环境影响评价并经环保部门审批后即可立项",{"key":19,"text":20,"correct":14},"C","只需做水土保持方案并经水行政主管部门审批后即可立项",{"key":22,"text":23,"correct":24},"D","首先由水行政主管部门审批水土保持方案，之后由环境保护主管部门审批环境影响报告，最后由计划主管部门审批项目的立项",true,"原国家发展计划委员会、环保局、水利部根据法律法规的规定，于1994年制定了《开发建设项目水土保持方案审批管理办法》，调整了建设项目立项审批的程序，首先由水行政主管部门审批水土保持方案，其次由环境保护主管部门审批环境影响报告，最后由计划主管部门审批项目的立项。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]