[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959401,695,1,"单选题","根据《开发建设项目水土保持方案审批管理办法》，开发建设项目的( )阶段报批水土保持方案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":18},"B","可行性研究",true,{"key":20,"text":21,"correct":14},"C","初步设计",{"key":23,"text":24,"correct":14},"D","规划","原国家发展计划委员会、环保局、水利部根据法律法规的规定，于1994年制定了《开发建设项目水土保持方案审批管理办法》，调整了建设项目立项审批的程序，首先由水行政主管部门审批水土保持方案，其次由环境保护主管部门审批环境影响报告，最后由计划主管部门审批项目的立项。管理办法中明确在开发建设项目的可行性研究阶段报批水土保持方案。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]