[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959324":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959324,695,2,"多选题","水电站厂房各层高程确定的顺序是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确定水轮机的安装高程",true,{"key":16,"text":17,"correct":18},"B","最后确定压力钢管的进口高程",false,{"key":20,"text":21,"correct":14},"C","向下依次确定尾水管底板高程、开挖高程",{"key":23,"text":24,"correct":14},"D","向上依次确定水轮机层地板高程、发电机层地板高程、吊车轨顶高程、厂房天花板及屋顶高程","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]