[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959254":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},959254,695,1,"单选题","干渠、支渠布置以( )为目的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","争取最大的自流灌溉面积",true,{"key":16,"text":17,"correct":18},"B","争取最大的灌溉面积",false,{"key":20,"text":21,"correct":18},"C","争取最好的排水效果",{"key":23,"text":24,"correct":18},"D","争取最小的工程量","对于各级灌溉渠道，选择在各自控制范围内地势较高的地带，干渠、支渠宜沿等高线或分水岭布置，以争取最大的自流灌溉面积。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]