[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959213":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},959213,695,1,"单选题","碾压式土石坝坝坡的选择应最终经过( )确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","稳定计算",true,{"key":16,"text":17,"correct":18},"B","防渗计算",false,{"key":20,"text":21,"correct":18},"C","参照已建坝经验",{"key":23,"text":24,"correct":18},"D","A和B","碾压式土石坝坝坡应根据坝型、坝高、坝的等级、坝体和坝基材料的性质、坝所承受的荷载以及施工和运用条件等因素，参照已建坝的经验，先初拟坝坡，最终应经稳定计算确定。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]