[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959194":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959194,695,2,"多选题","水锤计算应提供的计算成果应包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","正常工况最高压力线",true,{"key":16,"text":17,"correct":14},"B","特殊工况最高压力线",{"key":19,"text":20,"correct":14},"C","特殊工况最低压力线",{"key":22,"text":23,"correct":24},"D","正常工况最低压力线",false,"ABC","水锤压力计算应与机组转速变化计算配合进行，提供计算成果应包括正常工况最高压力线、特殊工况最高压力线、最低压力线。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]