[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959110":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959110,695,2,"多选题","封堵下闸的设计流量可用( )分析确定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","封堵时段5～20年重现期的瞬时流量",false,{"key":16,"text":17,"correct":14},"B","封堵时段5～10年重现期的瞬时流量",{"key":19,"text":20,"correct":21},"C","封堵时段5～10年重现期的月或旬平均流量",true,{"key":23,"text":24,"correct":21},"D","实测水文统计资料","CD","根据封堵工程施工期间的导流设计标准及水库初期蓄水标准，封堵下闸的设计流量可用封堵时段5～10年重现期的月或旬平均流量，或按实测水文统计资料分析确定。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]