[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959091":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},959091,695,1,"单选题","地基处理属隐蔽性工程，必须根据水工建筑物对地基的要求，认真分析地质条件，进行技术经济比较，选择施工方案。重要工程须通过现场试验验证，确定地基处理( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","各种参数、时间",false,{"key":16,"text":17,"correct":14},"B","施工程序、规模",{"key":19,"text":20,"correct":14},"C","施工程序和工艺、时间",{"key":22,"text":23,"correct":24},"D","各种参数、施工程序和工艺",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]