[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959085":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},959085,695,1,"单选题","封堵工程施工阶段的导流设计标准，可根据工程重要性、失事后果等因素在该时段( )范围内选定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","5～10年重现期的月或旬平均流量",false,{"key":16,"text":17,"correct":14},"B","5～10年重现期的瞬时流量",{"key":19,"text":20,"correct":14},"C","5～20年重现期的月或旬平均流量",{"key":22,"text":23,"correct":24},"D","5～20年重现期的瞬时流量",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]