[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959084":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},959084,695,1,"单选题","水流条件复杂或在运用中有通航、过木、冲沙、排冰等综合要求的大型导流工程，在设计中应( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不进行导流水工模型试验",false,{"key":16,"text":17,"correct":18},"B","进行导流水工模型试验",true,{"key":20,"text":21,"correct":14},"C","做动床模型试验",{"key":23,"text":24,"correct":14},"D","不做动床模型试验","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]