[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959067":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959067,695,2,"多选题","分期导流适用于( )的坝址。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","河流流量小",false,{"key":16,"text":17,"correct":18},"B","河流流量大",true,{"key":20,"text":21,"correct":18},"C","河槽宽",{"key":23,"text":24,"correct":18},"D","覆盖层薄","BCD","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]