[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959066":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},959066,695,2,"多选题","工程进度计划一般分( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","总进度计划",true,{"key":16,"text":17,"correct":14},"B","单项工程进度计划",{"key":19,"text":20,"correct":14},"C","作业计划",{"key":22,"text":23,"correct":24},"D","施工措施计划",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]