[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-959023":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},959023,695,2,"多选题","施工导流设计的主要任务是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分析研究水文、地形、地质、水文地质、枢纽布置及施工条件等基本资料",true,{"key":16,"text":17,"correct":14},"B","选定导流方式、导流标准，确定导流设计流量，划分导流时段",{"key":19,"text":20,"correct":14},"C","选择导流方案及导流建筑物的型式，确定导流建筑物的布置、构造及尺寸",{"key":22,"text":23,"correct":14},"D","确定导流建筑物的修建、拆除、封堵的施工方法以及截断河床水流、拦洪度汛和基坑排水等措施","ABCD","施工导流设计的主要任务是：①在充分分析研究水文、地形、地质、枢纽布置及施工条件等基本资料的前提下，确定导流标准及导流方式；②确定导流建筑物布置，进行导流挡水建筑物和泄水建筑物设计；③截流设计；各期度汛设计；④基坑排水设计；施工期通航、排冰、临时泄水建筑物封堵及蓄水期对下游供水设计。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]