[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958952":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},958952,695,1,"单选题","应预测评价工程兴建后河道流速、流向和泥沙冲淤变化对环境的影响的工程是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","多沙河流供水工程",false,{"key":16,"text":17,"correct":14},"B","灌溉工程",{"key":19,"text":20,"correct":14},"C","水库工程",{"key":22,"text":23,"correct":24},"D","河道整治工程",true,"水文、泥沙情势的变化是导致工程运行期间生态与环境影响的原动力。水库工程应预测评价库区、坝下游及河口的水位、流量、流速和泥沙冲淤变化及对环境的影响。灌溉、供水工程应预测评价水源区、输水沿线区、调蓄水域和受水区水文、泥沙情势变化及对环境的影响。多沙河流供水工程应预测评价泥沙淤积的环境影响。河道整治工程应预测评价工程兴建后河道流速、流向和泥沙冲淤变化对环境的影响。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]