[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958914":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},958914,695,1,"单选题","针对工程造成的不利影响，主要依据( )采取对策措施。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程分析",false,{"key":16,"text":17,"correct":14},"B","环境监测数据",{"key":19,"text":20,"correct":21},"C","环境影响报告书(表)预测评价结论",true,{"key":23,"text":24,"correct":14},"D","工程排污数据","环境保护对策措施是根据环境影响报告书(表)预测评价结论，针对工程造成不利影响的对象、范围、时段、程度，根据环境保护目标要求，提出预防、减免、恢复、补偿、管理、监、测等对策措施。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]