[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958875":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},958875,695,1,"单选题","丰水期主要预测的水文变化过程是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","河水流向",false,{"key":16,"text":17,"correct":14},"B","特枯流量",{"key":19,"text":20,"correct":14},"C","输沙量",{"key":22,"text":23,"correct":24},"D","不同频率洪水流量及过程的变化",true,"预测水文情势变化范围、主要特征和参数应全面考虑工程环境影响涉及的环境因子。丰水期主要预测不同频率洪水流量及过程的变化，枯水期主要预测特枯流量、枯水期平均流量变化。泥沙主要分析输沙率、含沙量和库区、河道冲淤变化等。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]