[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958823":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},958823,695,1,"单选题","提出淹没控制高程，作为拟定正常蓄水位的重要条件；收集及必要时重点调查淹没实物指标，初步分析安置环境容量及移民安置的去向和条件；估算淹没补偿投资，是( )阶段的主要内容之一。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":18},"B","预可行性研究",true,{"key":20,"text":21,"correct":14},"C","可行性研究",{"key":23,"text":24,"correct":14},"D","初步设计","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]