[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958784":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},958784,695,1,"单选题","可行性研究报告阶段，应该( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","初步确定水文参数和结果",false,{"key":16,"text":17,"correct":14},"B","提出水文、泥沙参数和成果",{"key":19,"text":20,"correct":21},"C","确定主要水文参数和成果",true,{"key":23,"text":24,"correct":14},"D","复核水文成果","A项为项目建议书阶段，B项为预可行性研究报告阶段，D项为初步设计阶段的主要内容之一。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]