[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958701":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},958701,695,1,"单选题","4级土石坝的洪水标准为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设计取重现期100～50年，校核取重现期2000～1000年",false,{"key":16,"text":17,"correct":14},"B","设计取重现期500～100年，校核取重现期5000～2000年",{"key":19,"text":20,"correct":14},"C","设计取重现期1000～500年，校核取可能最大洪水(PM或10000～5000年",{"key":22,"text":23,"correct":24},"D","设计取重现期50～30年，校核取重现期1000～300年",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]