[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958688":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},958688,695,2,"多选题","水电工程设计阶段的调整内容( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","增加预可行性研究报告阶段",true,{"key":16,"text":17,"correct":14},"B","将原有可行性研究和初步设计两阶段合并",{"key":19,"text":20,"correct":14},"C","取消原初步设计阶段",{"key":22,"text":23,"correct":24},"D","增加技施设计阶段",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]