[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958650":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},958650,695,1,"单选题","分析工程对环境产生的主要有利和不利的影响，从环境角度初步分析工程建设的可行性，是( )阶段的主要内容之一。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":18},"B","预可行性研究",true,{"key":20,"text":21,"correct":14},"C","可行性研究",{"key":23,"text":24,"correct":14},"D","初步设计","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]