[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958599":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},958599,695,1,"单选题","对还原水量和还原后的天然径流量成果，要进行( )检查。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","代表性",false,{"key":16,"text":17,"correct":14},"B","一致性",{"key":19,"text":20,"correct":21},"C","合理性",true,{"key":23,"text":24,"correct":14},"D","可靠性","对还原水量和还原后的天然径流量成果，要进行合理性检查。采用分项调查法进行还原计算时，要着重检查和分析各项人类活动措施数量和单项指标的准确性；经还原计算后的上下游、干支流长时段径流量，要基本符合水量平衡原则。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]