[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958483":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},958483,695,1,"单选题","当涝区的降雨、流量资料比较全，计算精度要求较高时，应选用哪种方法计算排水沟道的设计排涝流量？( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","经验公式法",false,{"key":16,"text":17,"correct":18},"B","产、汇流方法",true,{"key":20,"text":21,"correct":14},"C","排涝模数公式法",{"key":23,"text":24,"correct":14},"D","平均排除法","产、汇流方法适用于降雨、流量资料比较全，计算精度要求较高的涝区。根据设计暴雨间接推算设计排涝流量，设计暴雨历时应根据涝区特点、暴雨特性和设计要求确定。当人类活动使流域产流、汇流条件有明显变化时，应考虑其影响。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]