[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958461":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},958461,695,1,"单选题","跨流域、人湖、人海的分洪道，其分洪口的设计水位，确定依据为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计水面线",true,{"key":16,"text":17,"correct":18},"B","最大水面线",false,{"key":20,"text":21,"correct":18},"C","平均水面线",{"key":23,"text":24,"correct":18},"D","最小水面线","跨流域、人湖、人海的分洪道，其分洪口的设计水位，应根据所在河道的设计水面线，考虑分洪降落影响后确定。分洪道设计水位的确定条件，进口端是比较明确的，出口端则较为复杂，需要根据分出与分人河道的来水情况，考虑一定的遭遇组合。一般认为，如二者来源相近，河道规模差别不大，需要考虑同频率遭遇的可能性；否则，就不一定需要这样考虑，出口端水位在分析历年洪水遭遇情况基础上只考虑偏于恶劣情况即可。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]