[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958447":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},958447,695,1,"单选题","水库遇到( )时，在坝前达到的最高水位为防洪高水位。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","下游防护对象的设计标准洪水",true,{"key":16,"text":17,"correct":18},"B","大坝的设计洪水",false,{"key":20,"text":21,"correct":18},"C","大坝的校核洪水",{"key":23,"text":24,"correct":18},"D","任何标准洪水","水库遇到下游防护对象的设计标准洪水时，在坝前达到的最高水位称防洪高水位。只有当水库承担下游防洪任务时，才需确定这一水位。此水位可采用相应下游防洪标准的各种典型设计洪水，按拟定的防洪调度方式，自防洪限制水位开始进行水库调洪计算求得。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]