[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958409":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},958409,695,2,"多选题","根据《水利水电工程地质勘察规范》(GB50287—99)，水利电力工程场地和( )应根据工程的重要性和地区的地震地质条件，按有关规定进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地震安全性评价",false,{"key":16,"text":17,"correct":18},"B","地震危险性评价",true,{"key":20,"text":21,"correct":14},"C","地震破坏性评价",{"key":23,"text":24,"correct":18},"D","地震基本烈度","BD","根据《水利水电工程地质勘察规范》(GB50287—99)，水利水电工程场地地震基本烈度和地震危险性分析应根据工程的重要性和地区的地震地质条件，按有关规定进行。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]