[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958379":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},958379,695,2,"多选题","新建堤防工程初步设计阶段的任务和要求是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","察明堤防沿线各工程地质单元的工程地质条件，并对地基抗滑稳定、渗透稳定和抗冲能力作出评价",true,{"key":16,"text":17,"correct":14},"B","预测堤防挡水后堤基及堤内相关水文地质工程地质条件的变化，并提出相应的处理措施建议",{"key":19,"text":20,"correct":21},"C","察明导流工程的工程地质条件，根据需要进行施工附属建筑物场地的工程地质勘察和施工与生活用水水源初步调查",false,{"key":23,"text":24,"correct":14},"D","进行天然建筑材料详察","ABD","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]