[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958319":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":13},958319,695,2,"多选题","水利水电工程场地地震动参数应根据工程的重要性和地区的地震地质条件，按下列哪些规定确定？( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","",true,{"key":16,"text":17,"correct":18},"B","对100年超越概率10％的地震动峰值加速度大于或等于0.10g地区，土石坝坝高超过90m、混凝土坝及浆砌石坝坝高超过l30m的大型工程，宜进行场地地震安全性评价工作",false,{"key":20,"text":21,"correct":14},"C","对50年超越概率10％的地震动峰值加速度大于或等于0.10g地区的大型引调水工程的重要建筑物，宜进行场地地震安全性评价工作",{"key":23,"text":24,"correct":14},"D","场地地震安全性评价应包括工程使用期限内，不同超越概率水平下，工程场地基岩的地震动参数","ACD",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]